South Ridge Community Park Enhancement Project
South Ridge Park renovations including new parking lot, shelter structure, splash pad, playgrounds, sand volleyball court, bike paths, concrete sidewalk, and utilities Removal and replacement of existing asphalt paved parking lots, new parking lots, pathways, sidewalks, concrete pads, curbing, ramps, storm sewer, sanitary sewer, water main systems, landscape restoration, storm water pollution prevention, playgrounds, splash pad, new building, underground detention retention, sand volleyball court, shelter structure
AI helper
Sealed bids due February 11, 2020 at 10:00 AM. Project includes parking lots, shelter, splash pad, playgrounds, volleyball court, bike paths, sidewalks, utilities. Bid bond 5% required. Prevailing wage applies. Contractor installs playground, fitness, splash pad, shelter equipment purchased by district. District installs seeding, erosion blanket, trees, shrubs. Contractor provides 6 topsoil, concrete, foundations, utilities for bathroom. Completion by September 18, 2020. Questions to dhugen@heparks. org.
Construction must be completed by September 18, 2020. The document states: completion date: september 18, 2020.
Bidders must submit at least five references for similar projects completed within the past two years. The document states: please submit at least five 5 references for similar projects completed within the past two 2 years.
Damage to existing trees results in a backcharge of $100 per caliper inch. The document states: any damage to an existing tree will result in a backcharge to the contract of 100 per caliper inch of the damaged tree.
Concrete samples are required. The document states: the contractor will be required to provide samples of all concrete used for this project. one test cylinder will be required from each truckload of concrete delivered to the site.
Failure to complete project references or subcontractor list will result in disqualification. The document states: failure to complete will result in disqualification of bid.