USA | UT | DAVIS COUNTY | HILL AFB
Component Improvement Program - The Component Improvement Program utilized Research and Development funding to award a 9 Year Requirements, Cost- Reimbursement contract. This action is Sole source using a Justification and Approval document which is redacted and attached to this
Research and Development ( R& D) for Secondary Power Systems ( SPS) Follow- on requirements contract for research, development, prototypes, and engineering services to support redesign, study, and analysis of secondary power systems ( SPS) including gearboxes, auxiliary power units ( APU), jet fuel starters ( JFS), oil pumps, fuel controls, etc. , for multiple weapons systems. This includes R& D, continuing sustainment engineering efforts, technical data, drawings, change proposals, manpower support, design activities, prototype hardware, testing, product and procedure improvements, and reports.
AI helper
This is a sole source follow-on requirements contract for Research and Development (R&D) of Secondary Power Systems (SPS) for multiple weapons systems. The contract type is Cost Plus Fixed Fee (CPFF) with a 9-year duration (5-year basic, 4-year option). The estimated contract cost is not specified numerically. The work includes design, prototyping, testing, and sustainment engineering. The contract is funded under the Component Improvement Program (CIP) using research and development funds.
The contract period of performance is a total of 10 years, with a completion date of 31 Oct 2035.