Coachella Valley Water District - CA
Reservoirs ****- 3 and ****- 4 Construction Project Construct Reservoirs ****- 3 and ****- 4, two new reservoirs with 1. 0 MG in capacity each, aboveground welded steel tanks and demolish the existing Reservoirs ****- 1 and ****- 2 with 100, 000 gallon in capacity each including site clearing and grading, earthwork, over- excavation, reservoirs foundation, berm & riprap, retaining wall, piping, coating and painting, electrical, solar panels, batteries, and seismic equipment box bracing, instrumentation syst
Construct reservoirs **** and ****, two new reservoirs with 1. 0 mg in capacity each, aboveground welded steel tanks and demolish the existing reservoirs **** and **** with 100, 000 gallon in capacity each including site clearing and grading, earthwork, overexcavation, reservoirs foundation, berm riprap, retaining wall, piping, coating and painting, electrical, solar panels, batteries, and seismic equipment box bracing, instrumentation systems, cathodic protection systems, new site fencing including desert tortoise exclusion fencing, and all necessary and related appurtenances complete, in place, and operational as shown in the contract drawings.
Bid Close Date: