Sealed bids are due by 12:00 PM CDT on August 11, 2026, for the construction of a 46,000 sq ft pre-engineered metal building to house ship propeller production and office space. The contract duration is 540 consecutive calendar days. Bids can be submitted sealed or electronically via www. ***. *. * bid bond of 5% is required for bids over $50,000. Contractors must comply with Mississippi Code Section **** for bids over $50,000. The county reserves the right to reject any or all bids.
Bids are to be received by 12:00 noon CDT on Tuesday, August 11, 2026. The total contract time will be 540 consecutive calendar days. envelopes containing the bid must be sealed, stamped, and received by 12:00 noon on tuesday, august 11, 2026
All bids submitted in excess of $50,000 must comply with Section ****, Mississippi Code of ****, by having a current certificate of responsibility from the State Board of Public Contractors. All bids submitted in excess of 50, 000 by a prime or subcontractor to do any erection, building, construction, repair, maintenance, or related work, must comply with section ****, mississippi code of ****, by having a current certificate of responsibility from the state board of public contractors.
Liquidated damages will be $500 per consecutive calendar day thereafter. he liquidated damages will be 500 per consecutive calendar day thereafter.
Bids not containing the bidder's name and mailing address on the face of the envelope, or not specifying the name of the bid item, may not be opened. Failure to include the certificate of responsibility number or statement for bids under $50,000 on the exterior of the envelope will result in the bid not being opened or considered. bidders certificate of responsibility number or a statement that the bid inside is less than 50, **** shall appear on the outside or exterior of the envelope or container of such bids, failing which, said bid shall not be opened or considered.