This is a public tender notice from Washtenaw Community College for a modular floor replacement (Bid ****). A mandatory site visit is required, scheduled for May 19, 2026, at 9:00 a. m. EDT. Questions regarding the bid must be submitted by May 25, 2026, at 2:00 p. m. EDT to don harrison, purchasing agent, at ***@***. *. * to questions will be posted by May 26, 2026, at 2:00 p. m. EDT. The bid due date is May 28, 2026, at 2:00 p. m. EDT. Bids will be received via email at ***@***. *. * bid bond of 5% is required for bids over $50,000. The public opening will be held electronically via Zoom on May 28, 2026, at 2:30 p. m. EDT. The scope of work includes providing and installing three new modular floor replacements for a bakery cooler, bakery freezer, and culinary cooler. The flooring must be NSF approved, wood frame construction, with polyurethane insulation, aluminum tread plate, and made in the USA. The contractor is responsible for all labor, equipment, materials, and incidentals to complete the work in accordance with specifications, drawings, and applicable codes. A contractor responsibility form must be completed and submitted with the bid.
The bid notice does not explicitly state a delivery deadline for the completed work. However, it mentions that the contractor shall provide a schedule/workplan for obtaining necessary permits, materials, and procurement of long-lead items to begin and complete the work as scheduled. The time of completion is considered an essential part of the bid and will be made part of the contract.
The bid notice does not specify the payment terms.
The bid notice does not specify warranty requirements.
The bid notice states that material proposals to be used for the completion of work, the competency, solvency, reputation, and responsibility of the bidders, startcompletionduration times, and other issues deemed relevant by the owner and the engineer will be considered. All responsible bidders will receive due consideration before the awarding of this contract. It also notes that In the reception of proposals for the work, the owner incurs no obligation to accept the lowest priced proposal.
The bid notice requires bidders to complete a Contractor Responsibility Form, which includes questions about bonding and insurance requirements, debarment or suspension, contract defaults, license revocations, criminal convictions related to contracting, violations of applicable laws, pending litigation, payment of craft employees, W2 employee status, OSHA 10-hour training, participation in apprenticeship programs, technical qualifications, resources, and the ability to provide a listing of similar projects completed.
The bid notice does not explicitly detail penalties for non-compliance or delays.
The bid notice states, A site visit is required and bids will not be accepted from bidders who have not inspected the site to obtain firsthand knowledge of existing conditions. The scheduled site visit is on May 19, 2026, at 9:00 a. m. EDT at the Damon Flowers Building, Washtenaw Community College, Ann Arbor, MI.
The bid notice does not mention any requirement for sample submission.
The bid notice does not specify a deadline for challenges or objections.
The bid notice does not provide an estimated total value for the project.