12/04/2025 - USA | FL | NAS JACKSONVILLE | 32212
NSGB Potable Water Production and Distribution - The scope of the requirement is immediate production and transfer of potable water to the Leeward side of NSGB.
Potable water production and distribution at Naval Station Guantanamo Bay ( NSGB) The services to be perfomred include all labor, supervision, management, tools, materials, equipment, transportation, sustainment, maintenance, and all similar or incidental engineering and facilities engineering support services to effectively provide 80, 000 gallons per day of potable water to the leeward side weekly on a 24/7 basis until seawater reverse osmosis ( SWRO) unit is operational. Provide, install, and operate a portable SWRO unit capable of producing 132, 000 gallons/day for 180 days. Make system connection to leeward potable distribution system.
AI helper
The contract is for potable water production and distribution at Naval Station Guantanamo Bay (NSGB). The services include labor, supervision, materials, and operation of a SWRO unit. The contract is being negotiated on a sole-source basis due to the urgency of providing potable water. The base period is 6 months, from August 31, 2025, to February 28, 2026. The estimated dollar value is not to exceed the amount specified in the contract.
The bid notice states The services to be perfomred include all labor, supervision, management, tools, materials, equipment, transportation, sustainment, maintenance, and all similar or incidental engineering and facilities engineering support services to effectively provide 80,000 gallons per day of potable water to the leeward side weekly on a 24/7 basis until seawater reverse osmosis (SWRO) unit is operational.
The bid notice states estimated dollar value: not to exceed nte.