Dept Of Defense- Dept Of The Army- Usace- Nad- W2Sd Endist New England
Culvert Replacement, Knightville Dam, Huntington, MA - THE WORK CONSISTS OF: Furnish all labor, materials, and equipment needed to perform replacement of 2 culverts at Knightville Dam, Huntington, MA. Contractor will be responsible for all final measurements. Culvert 1. The Contractor
Culvert replacement Replacement of 2 culverts at Knightville Dam, Huntington, MA. Culvert 1: remove existing stone box culvert ( approx. 64 ft long, 3x3 ft opening) and replace with new precast concrete 3- sided box culvert. Culvert 2: replace corrugated metal pipe ( approx. 28 ft long, 24 inches diameter) crossing under asphalt paved entrance road.
Bid Close Date: