Lot 1: Mobilization
Lot 2: Maint and restoration of haul roads
Lot 3: Shoulder preparation
Lot 4: Aggregate surfacing class 1
Lot 5: Aggregate surfacing special
Lot 6: Mill bituminous surface ( 1. 0)
Lot 7: Mill notches
Lot 8: Bituminous material for tack coat
Lot 9: Type sp 9. 5 wearing course mixture ( 2, b)
Lot 10: Traffic control
Lot 11: Raised pavement marker temporary
Lot 12: Interim pavement marking
Lot 13: 4 solid line paint
Lot 14: 6 solid line paint
Lot 15: 4 broken line paint
Lot 16: Mobilization
Lot 17: Maint and restoration of haul roads
Lot 18: Shoulder preparation
Lot 19: Aggregate surfacing class 1
Lot 20: Aggregate surfacing special
Lot 21: Mill bituminous surface ( 1. 0)
Lot 22: Mill notches
Lot 23: Bituminous material for tack coat
Lot 24: Type sp 9. 5 wearing course mixture ( 2, b)
Lot 25: Traffic control
Lot 26: Raised pavement marker temporary
Lot 27: Interim pavement marking
Lot 28: 4 solid line paint
Lot 29: 6 solid line paint
Lot 30: 4 broken line paint
Lot 31: Mobilization
Lot 32: Maint and restoration of haul roads
Lot 33: Aggregate surfacing class 1 ( b)
Lot 34: Aggregate surfacing special
Lot 35: Mill notches
Lot 36: Bituminous material for tack coat
Lot 37: Type sp 9. 5 wearing course mixture ( 2, b)
Lot 38: Traffic control
Lot 39: Raised pavement marker temporary
Lot 40: Interim pavement marking
Lot 41: 4 solid line paint
Lot 42: 6 solid line paint
Lot 43: 4 broken line paint
Lot 44: Mobilization
Lot 45: Maint and restoration of haul roads
Lot 46: Remove bituminous pavement
Lot 47: Shoulder preparation
Lot 48: Aggregate surfacing class 1 ( b)
Lot 49: Aggregate surfacing special
Lot 50: Full depth reclamation
Lot 51: Mill bituminous surface ( 1. 0)
Lot 52: Mill bituminous surface ( 1. 5)
Lot 53: Mill notches
Lot 54: Bituminous material for tack coat
Lot 55: Type sp 9. 5 wearing course mixture ( 2, b)
Lot 56: Lining culvert pipe ( 24) special
Lot 57: Traffic control
Lot 58: Raised pavement marker temporary
Lot 59: Storm drain inlet protection
Lot 60: Interim pavement marking
Lot 61: 4 solid line paint
Lot 62: 6 solid line paint
Lot 63: 24 solid line paint
Lot 64: 4 broken line paint
Lot 65: Mobilization
Lot 66: Maint and restoration of haul roads
Lot 67: Pavement marking removal
Lot 68: Pavement marking removal
Lot 69: Remove casting
Lot 70: Remove valve box
Lot 71: Sawing concrete pavement ( full depth)
Lot 72: Remove pipe culverts
Lot 73: Remove concrete pavement
Lot 74: Excavation - common
Lot 75: Select granular embankment mod 7% ( cv)
Lot 76: Haul and place excess material ( lv)
Lot 77: Shoulder preparation
Lot 78: Aggregate surfacing class 1 ( b)
Lot 79: Aggregate base ( cv) class 5
Lot 80: Mill bituminous surface
Lot 81: Mill bituminous surface ( 1. 5)
Lot 82: Mill bituminous surface ( 2. 0)
Lot 83: Mill notches
Lot 84: Bituminous material for tack coat
Lot 85: Type sp 9. 5 wearing course mixture ( 2, b)
Lot 86: Type sp 9. 5 wearing course mixture ( 3, c)
Lot 87: Type sp 12. 5 non wearing course mixture ( 3, c)
Lot 88: Crushed rock ( cv)
Lot 89: 24 rc pipe apron
Lot 90: 24 rc pipe culvert
Lot 91: Culvert excavation class u
Lot 92: Valve box extension
Lot 93: Casting assembly
Lot 94: Portable precast concrete barrier design ****
Lot 95: Relocate portable precast concrete barrier design ****
Lot 96: Traffic control
Lot 97: Raised pavement marker temporary
Lot 98: Temporary impact attenuator
Lot 99: Relocate temporary impact attenuator
Lot 100: Soil bed preparation
Lot 101: Common topsoil borrow
Lot 102: Fertilizer type 3
Lot 103: Seeding
Lot 104: Hydraulic bonded fiber matrix
Lot 105: Rapid stabilization method 3
Lot 106: Seed oats
Lot 107: Seed turfgrass
Lot 108: Interim pavement marking
Lot 109: 4 removable preformed pavement marking tape
Lot 110: 4 solid line paint
Lot 111: 6 solid line paint
Lot 112: 12 solid line paint
Lot 113: 4 broken line paint
Lot 114: 6 broken line paint