Port Of Everett-WA
Outfall 012 Stormwater Treatment Retrofit - The Work to be performed under this Contract includes providing labor, materials, and equipment necessary to make improvements to the existing stormwater conveyance and treatment within the North Yard of the Port of Everetts Hewitt Terminal facility. General elements of this work include the removal of an existing stormwater catch basin and piping, replacement with larger- capacity structure and piping, and installation of a stormwater treatment system approved un
Bid Close Date: