Jasper County - SC
Honey hill driveway
honey hill battlefield driveway sight distance clearing project 1. SCDOT permit all work shall be in accordance with SCDOT permit number **** 2. Utility coordination and protection see inset call 811 and coordinate with and protect all existing underground and overhead utilities 3. Clearing trees with traffic control map inset cut trees within 6 of ground level and remove timber according to industry best practices. area to be cut is on the south side of road starting approximately 365 east of the centerline of honey hill battlefield drive to euhaw creek, approximately 375 in length, and between the south edge of pavement to the power line. there are approximately 75 trees in this area. tree cutting operations shall take place between 9am and 3pm. during the cutting operation the eastbound lane shall be closed with a flagging operation in accordance with SCDOT standard drawings **** and **** 10. when trees are being dropped, traffic will be stopped in both directions. 4. Stump grinding and brush hoggi
Bid Close Date: