USA | FL | WAKULLA COUNTY | CRAWFORDVILLE | 32327
Small City
Wakulla County - FL
Metal Building Kit/ Building Engineering Drawings
Metal Building for Community Center Recovery Pod
Purchase of a preengineered metal building ( PEMB) package for the community center recovery pod Preengineered metal building package, 24 feet wide by 75 feet long, shed roof pitch approximately 4 in 12, building structure, engineering documentation, structural drawings, wind load calculations, building plans, construction details, bracing details, anchor bolt sizes
AI helper
Procurement of a preengineered metal building package for a community center recovery pod in Wakulla County, Florida. Building is 24' wide x 75' long with shed roof pitch of approximately 4 in 12. Must comply with Florida Building Code, include drawings signed by a Florida licensed structural engineer, verifiable wind load calculations, and structural documentation. Quotes due November 13, 2026 at 3:00 PM EST. Submission via hand delivery, express mail, or email. Award based on lowest cost, responsible and responsive vendor. Insurance requirements include comprehensive auto, commercial general liability, professional liability, and workers compensation.
Quotes are due by November 13, 2026 at 3:00 PM EST. The selected vendor will work with the project manager to develop a project timeline after award. As stated: quote responses are due by: november 13, 2026 @3: 00 pm est.
The contract will be awarded to the lowest cost, responsible and responsive vendor capable of performing the services. As stated: the lowest cost, responsible and responsive vendor who is capable of performing the services or supplying the commodities or equipment shall be awarded the contract.
Vendors must have required expertise and capability to perform the work or supply the commodities. As stated: all vendors providing written quotes must have the required expertise and capability to perform the work or supply the commodities or equipment.
Responses received after the deadline will not be considered. As stated: responses received after the above deadline will not be considered.