The Jacksonville Housing Authority (JHA) is soliciting bids for the replacement of stairs, bulkheads, and boardwalks at the Westwood property. The process involves a two-step bidding process. A mandatory site walkthrough is available on **** or 09182026. The proposal submission deadline is **** at 3 pm EST. The contractor must adhere to strict safety and site cleanliness requirements, and the project duration is up to 180 days, with liquidated damages of $150 per day for schedule delays. Progress payments are made at 30-day intervals, subject to a 10% retainage.
Progress payments for acceptable work and materials delivered and stored on the site will be made at 30day intervals. typically, progress payments for acceptable work and materials delivered and stored on the site will be made at 30day intervals.
All work provided by any contractor pursuant to any contract that ensues from this rfp shall be warranted or guaranteed by that contractor for a period of time of not less than 365 days. all work provided by any contractor pursuant to any contract that ensues from this rfp shall be warranted or guaranteed by that contractor for a period of time of not less than 365 days.
The agency will utilize several factors, including proposed costs (30 points), technical understanding (15 points), and quality of technical approach (20 points). factor max factor no. point type factor description value 1 30 points objective the proposed costs submitted by the proposer.
Bidders must submit documentation on managerial and financial capacity, including brief professional resumes, and provide a minimum of 3 former or current clients. the bidder entity must submit under this tab a concise description of its managerial and financial capacity to deliver the proposed services, including brief professional resumes for the persons identified within areas 5 and 6 of attachment d, profile of firm form.
If the contractor fails to maintain the construction schedule, heshe will be charged with liquidated damages of 150 per day. if the contractor fails to maintain this construction schedule, heshe will be charged with liquidated damages of 150 per day.
A mandatory site walkthrough is available on **** at 3pm est or **** at 3 pm est. preproposal meetingmandatory site walkthrough site walkthorugh **** at 3pm est or **** at 3 pm est
Written inquiries must be submitted by **** by 12 pm est. written inquiries submittal deadline **** by 12 pm est
Failure to abide by the timeframe for informing the CO of any issue may relieve the agency of responsibility. failure to abide by this timeframe shall relieve the agency, but not the prospective or actual bidder, of any responsibility pertaining to such issue.