Town Of Windsor
Storm Sewer Replacement
15th Street Waterline Replacement The work includes the installation of approximately 3, 750 linear feet of 24- inch C900 PVC DR18 waterline and approximately 600 linear feet of 8- inch C900 PVC DR18 waterline, additional quantities of 16-, 12-, and 10- inch C900 waterline, three ( 3) combination air and vacuum valve assemblies, approximately 45 buried valves of various sizes, two fire hydrant assemblies, and three reconnections to existing fire hydrants. Additional scope includes the replacement of existin
Waterline Replacement Phase A: Installation of approximately 3, 750 linear feet of 24- inch C900 PVC DR18 waterline, 600 linear feet of 8- inch C900 PVC DR18 waterline, additional quantities of 16-, 12-, and 10- inch C900 waterline, three combination air and vacuum valve assemblies, approximately 45 buried valves, two fire hydrant assemblies, and three reconnections to existing fire hydrants. Includes replacement of existing storm drain piping with **** elliptical pipe and two storm inlet structures, pavement removal and replacement, mill and overlay pavement, landscape and natural surface restoration, and connections to the existing water system. Phase A substantial completion: 120 days from notice to proceed. Phase A final completion: 150 days from notice to proceed. Phase B: Storm sewer replacement and work from connection 01 sta **** to ftg07 sta 1129. Phase B substantial completion: on or before May 14, 2027. Phase B final completion: within 30 days of substantial completion.
Bid Close Date: