08/28/2025 - USA | AL | MOBILE COUNTY | MOBILE | 36601 Midsize City
Perimeter Fence Repair/Reno - Irvington Site Office, Irvington Alabama - Solicitation Number: TBD PSC - Z2PZ - Repair or Alteration of Other Non- Building Facilities Project Location: Irvington Site Office, U. S. Army Corps of Engineers, Mobile District, **** 13th St. ,
Fence repair and renovation for the Irvington site office, Irvington Alabama Line posts: existing count of 48 each line posts that have been selected and shall be removed and replaced in the same location. Posts shall be set plumb vertical within plus or minus 2 degrees 2 in each direction in12inchwide x 24inch deep concrete footings in accordance with astm f567. Concrete for post footings shall have a 28day compressive strength of 2, 500 psi. 17. 2mpa. They shall be round steel pipe and rail: astm **** group ia heavy industrial fence framework, schedule 40 galvanized pipe per astm **** fence shall be secured to the new posts with lacing wires being no more than 12inch spacing, support arms reinstalled secured by spot welding. Resultant post heights must match existing fence heights. Barbed wire arms: remove and replace a total of 15 damaged, bent, or rusted type ii, 45degree barbed wire arms. Support arms shall be 18inches, facing outward, each holding three strands of barbed wire at regular inte
AI helper
The project involves repairing and renovating the fencing at the Irvington site office in Irvington, Alabama. The contract period is 90 days. A pre-bid site visit is scheduled for September 9, 2025. Bidders must register in SAM (System for Award Management) and maintain an active registration status. The procurement is intended to be a 100% small business set-aside. The solicitation package will be available for download on or about September 24, 2025, with a tentative response date of October 13, 2025. The contractor is responsible for all necessary management, labor, materials, supplies, tools, equipment, plant, and vehicles required to perform the work. The contractor must comply with all applicable federal, state, county, city, and local laws, codes, and regulations. The contractor must submit a written safety plan, including an activity hazards analysis evaluation, prior to starting work. The contractor must ensure that perimeter security is restored at the end of each workday. The contractor must provide written notice of work completion to the contracting officer within two workdays of completion. A final punch list will be created during the acceptance inspection.
The contractor must give the government written notice of date and time of work activity completion such that the government representative can perform the required acceptance inspection. This completion notification can be by written letter or email notification to the contract cor. The contractors work completion written notice must be forwarded to the irvington site office not later than two 2 workdays mondayfriday after the work is accomplished.
The contractor must be registered in System for award management SAM and maintain an active registration status.
An organized pre bid site visit will be held on Tuesday, 9 September 2025, 9: 00 am CST at the project location.