County Of Whiteside-IL
2026 Pavement Rejuvenation
The work of this section shall consist of the application of rejuvenatorreclamite on the mainline and paved shoulders on various roads in whiteside county. Whiteside county crf: length width arealocation start end ft ft symatthew road hwy 30 approx **** w **** varies 6, 780coloma road district crf: length width arealocation start end ft ft symartin road 300 n of minkel st shore acres rd 995 21 2, 322sycamore dr martin road ann st 1, 290 21 3, 010sterling road district crf: length width arealocation start end ft ft sy6th ave wahl rd e 37th st 2, 680 22 6, 551e 37th st 6th ave freeport rd 5, 280 22 12, 907sterling road district reclamite: length width arealocation start end ft ft sye 37th st approx 600 e of hwy 40 6th ave 2, 050 22 5, 011
AI helper
Sealed proposals for the project described below will be received at the office of the county engineer until 10:30 am on 02/24/26. The successful bidder at the time of execution of the contract will be required to deposit a contract bond or proposal guaranty as provided for in the special provisions. Failure on the part of the contractor to deliver the material within the time specified or to do the work specified herein will be considered just cause to forfeit his surety as provided in article **** of the standard specifications. The contractor shall notify the engineer a minimum of two 2 working days prior to the commencement of any work which could be considered as a pay item in the contract. The contractor shall notify the engineer a minimum of one week prior to the commencement of any work to be completed on any parking lots. The contractor shall distribute by hand, a typed notice to all residences and businesses along the roadway to be treated no more than 24 hours prior to the treatment of the roadway.
Delivery in total or partial shipments as ordered shall be made within the time specified in the special provisions or by the acceptance at the point and in the manner specified in the schedule of prices. If delivery on the job site is specified, it shall mean any place or paces on the road designed by the awarding authority or its authorized representative.
Discounts will be allowed for payment as follows: calendar days calendar days discounts will not be considered in determining the low bidder.
The award decision is subject to approval by the department. Illinois department of transportation policy, adopted in accordance with the provisions of the illinois highway code, requires this contractto be awarded to the lowest responsive and responsible bidder.
The prospective contractor shall also submit a statement showing that they had at least five 5 years experience using the same rejuvenating emulsions that they are bidding on, street and road applications only.
Failure on the part of the contractor to deliver the material within the time specified or to do the work specified herein will be considered just cause to forfeit his surety as provided in article **** of the standard specifications.
The contractor shall present samples of materials, laboratory reports, calibration reports, and proof of work experience as required by these specifications to the resident engineer at the preconstruction meeting.