Dept Of Defense- Dept Of The Army- Usace- Lrd- W072 Endist Detroit
Poe Lock Gate 3 Replacement - THIS IS A SOURCES SOUGHT NOTICE. THIS IS FOR MARKET RESEARCH PURPOSES ONLY. This is NOT a solicitation. This is not a Request for Bid, Proposal, or Quote. It does not constitute a solicitation and shall not be construed as a commitment to the Gove
Fabrication and delivery of one replacement miter gate for the Poe Lock located at the Soo Locks Complex, St. Marys River, Sault Ste. Marie, MI. The miter gate consists of two fabricated gate leafs along with miscellaneous components for each leaf. Each gate leaf is comprised of welded horizontal girders and diaphragms connected to a vertical skin plate. The leaf is approximately 60 feet high by 5. 5 feet wide by 63 feet long and weighs approximately 225 tons. Each gate leaf is to be delivered in one piece on site assembly will not be accepted. Fabrication also includes miscellaneous items for each gate leaf such as diagonals pintle casting assembly gudgeon pin walkway framing, grating and handrail quoin and miter contact plates and blocks fender protection seals miscellaneous machined parts grease systems turning feet, wall quoin frame and contact block, hydraulic cylinder piston rod, gate connector assembly, and associated accessories. Miscellaneous items will be shipped loose and will be delivered with the
Bid Close Date: