Procurement of surreptitious equipment for Ukraine's National Police and State Border Guard Service. Equipment includes various lock decoders and code grabbers. Delivery is required FOB origin within 270 days from award. A one-year manufacturer warranty is required for specific items. A factory visit by an INL advisor may be conducted for quality assurance. The contract will be awarded based on the lowest priced technically acceptable offer. Offerors must be registered in SAM. gov and demonstrate export compliance experience.
Delivery shall be made FOB origin as soon as possible but not later than two hundred and seventy (270) days from the date of contract award. delivery shall be made fob origin as soon as possible but not later than two hundred and seventy 270 days from the date of contract award
Contract line items: 1, 2, and 11 should have minimum one (1) year warranty against defects. contract line items: 1, 2, and 11 should have minimum one 1 year warranty against defects.
The government will award this contract using lowest priced technically acceptable offer (LPTA) process. The government will award this contract using lowest priced technically acceptable offer lpta process.
To be considered for award, the contractor must be determined by the contracting officer to be responsible in accordance with the standards described in FAR **** be considered for award, the contractor must be determined by the contracting officer to be responsible in accordance with the standards described in far ****.
A factory warehouse visit may be conducted by INL COR and/or delegated representatives to evaluate quality assurance, quality control, shipping control, physical inspection of randomly selected finished items prior to shipping. A factory warehouse visit may be conducted by inl cor andor delegated representatives to evaluate quality assurance, quality control, shipping control, physical inspection of randomly selected finished items prior to shipping.
Failure to be in compliance with AECA and ITAR by date planned for commencement of contract performance as well as during the entire performance of work under this contract may result in contract termination. Failure to be in compliance with aeca and itar by date planned for commencement of contract performance as well as during the entire performance of work under this contract may result in contract termination.