09/02/2025 - USA | GA | BIBB COUNTY | MACON | 31201 Small City
26- 010- LH Paving The Way Project 2 ( IFB) ( 10/2/25)
Paving the way project2 milling tons ****, bituminous tack gal ****, roadway patching sy ****, 12. 5 mm superpave tonsasphalt ****, 9. 5 mm superpave tonsasphalt 0, install furnished sewermanhole, storm ea 105, manholes, install furnished water ea 97, valve risermanhole adjustment ea 105, water valve ea 97, adjustmenttraffic signal loop install ea 7, stripping center lines, lf ****, edge lines, lane linespainted arrows ea 37, bike symbols ea 0, painted messages ea 0, painted crosswalks lf 337, painted stop bars lf 202, painted rr symbols ea 0, painted hatching lf 339, rumble stripe set 1rpms mile 6. 81, clipping grassed mile 7. 89, shoulders
AI helper
Sealed bids are requested for Paving the way project2. Bids are due by 12:00 noon on Thursday, October 2, 2025. A prebid conference is scheduled for Wednesday, September 10, 2025, at 10:00 AM. Bid documents are available at the Macon-Bibb County Procurement Department. Bidders must submit a bid bond of 5% of the total base bid. The contract, if awarded, will be based on total bid price. The contractor will be responsible for obtaining all necessary permits and licenses. The contractor will be responsible for all traffic control and material disposal. The contractor will be responsible for any damage to underground utilities. The contractor will be responsible for any and all deductibles. The contractor shall guarantee all labor and workmanship for a minimum of one year from the date of completion. Subcontractor reporting requirements are outlined in the bid documents.
Bids are due no later than 12:00 noon on Thursday, October 2, 2025.
A 10% retainage will be withheld from each payment until final payment is made. The owner will only pay for items used and actual work performed. Change orders are issued for any variance from contract or plan sheets. Any unauthorized work or material change will not be paid for unless a change order has been issued.
The contractor shall guarantee all labor and workmanship for a minimum of one year from the date of completion.
The contract, if awarded, will be based on total bid price.
Each bidder, by making his bid, represents that he has read and understand the bidding documents and visited the site and became familiar with the local conditions under which the work is to be performed.
Liquidated damages in the amount of $75 shall be charged to the contractor for each day that the project is delayed beyond the completion date of the contract.
Bidders shall examine the areas wherein work of this project is to be carried out and shall take into consideration all conditions that might affect his work.