This is a combined synopsis-solicitation for the replacement of a swim dock at Sullivan Lake Campground in the Colville National Forest, Washington. The project includes the removal and disposal of the existing dock and the furnishing and installation of a new one. Offerors must choose between a metal frame or an HDPE modular option. The contract will be a firm-fixed-price award. Registration in SAM. gov is required. The Buy American Act applies. The period of performance is from the date of award to September 1, 2026. Offers must be submitted electronically by April 2, 2026, at 11:00 AM PST. The government will evaluate offers based on technical acceptability and price, considering the most advantageous offer to the government. The USDA Ombudsman program is available for agency protests.
The bid notice states that the new dock must be fully assembled and installed at Sullivan Lake Campground, and the old dock removed before the end of the period of performance of the contract, which is no later than September 1, 2026. dock must be fully assembled and installed at sullivan lake campground according to the requirements and the old dock removed before the end of the period of performance of the contract.
The bid notice states that the government will conduct a comparative evaluation of quotes and that one firm-fixed-price award will be made to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the government, price and other factors considered. one firm fixedprice award will be made to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the government, price and other factors considered.
The bid notice states that to be considered for award, offerors must submit a quote that includes material specifications, anchoring safety details, a price proposal, spec sheets, and a project schedule. o be considered for award, offerors must submit a quote that includes the following: material specification: offerors must clearly identify whether they are proposing option a metal frame, composite decking, encapsulated floats or option b hdpe modular. anchoring safety: brochures or specs must demonstrate an anchoring system capable of securing the dock at a 30ft depth. include how you will anchor the dock. price proposal: prices must be allinclusive of the dock, anchoring system, lighting, and delivery to the sullivan lake area. spec sheets: provide manufacturer specification sheets, brochures, or other descriptive literature for materials or product being offered. project schedule: provide a proposed timeline or statement confirming that all workincluding delivery, installation, and removal of the existing dockwill be completed no later than september 1, 2026
The bid notice states that protests must be filed within the timeframes specified in FAR **** must be filed within the timeframes specified in far ****.