Agriculture, Department Of- Forest Service- Usda Forest Service
Hiking App
Huntington Ravine Winter Access Trail Replacement - The new bid date will be 22 September 2025 at **** EST. Bid opening link attached. The opening will be Sep 22 **** EST. Inspection reports have been added to the attached files. The U. S. Department
Construction of highways, roads, streets, bridges, and railways demolition of five existing trail bridges and unused material to be dispose of off fs lands. construction of the new trail bridges of varying lengths. bridge length are 41 foot overall length 24 ft main span and 17 ft approach span, two 26 foot bridges, a 30 foot and 24 foot bridges. four bridges are single span steel girder bridges with a timber plank deck on steel grade beam foundations. the 41 foot bridge is steel girder bridge with timber dowel lam deck on steel grade beam foundations. bridge plans provided show what the structures will use steel stringers, a timber decks and abutments. additional work includes but not limited to, approach surface treatment, removal of existing materials and placement of riprap. all construction will be following the attached plan set.
Bid Close Date: