City Of Huntington Beach
2025 Arterial Rehabilitation Pavement rehabilitation including cold mill and overlay, deep lifts, and FDR for a distance of 1. 93 miles. Isolated curb and gutter and sidewalk repair. Curb ramp replacement per plan. Installation of pedestrian push buttons, traffic loops, and striping. Affected utilities adjusted to grade. Remove and replace trees, plant new landscaping, and construct stamped concrete. Construction of 100 linear feet of new storm drain, construction of new catch basin, and storm drain connect
Bid Close Date: