City Of Truth Or Consequences
TRUTH OR CONSEQUENCES CRITICAL WATERLINE REPLACEMENTS The project includes the replacement and new installation of waterlines using open trench, jack and bore, and horizontal directional drilling ( HDD) methods. Open trench construction consists of approximately 116 linear feet ( LF) of 4- inch, 31, 508 linear feet ( LF) of 6- inch, 2, 812 LF of 8- inch, and 888 linear feet ( LF) of 10- inch C- 900 DR- 18 PVC waterline. All waterline replacements will be installed parallel to the existing waterlines. The pr
Waterline replacements and installation Replacement and new installation of waterlines using open trench, jack and bore, and horizontal directional drilling ( HDD) methods. Includes various sizes of PVC waterline ( 4- inch, 6- inch, 8- inch, 10- inch C- 900 DR- 18), installation of carrier pipes in steel casings, installation of new water service connections ( 316 total), new water meters and meter boxes, valves, fire hydrants, and connections to the existing water system. Site work includes roadway asphalt removal/replacement, and sidewalk, curb, gutter, and drive pad removal/replacement.
Bid Close Date: