**** DWTP LARGE- SCALE RECHARGE EXPANSION WELLS, ASR- 02 AND ASR- 03 PROJECT The purpose of this project is to enhance long- term water supply resilience through expanded Aquifer Storage and Recovery ( ASR) capacity. This expansion adds two new dedicated ASR well sites & ndash; ASR- 02 and ASR- 03 & ndash; that will store treated surface water from the San Juan- Chama ( SJC) project in the aquifer for later recovery. The construction elements of this project include drilling, constructing and equippi
AI helper
Project aims to enhance long-term water supply resilience by expanding aquifer storage and recovery (ASR) capacity with two new well sites (ASR-02 and ASR-03). Construction includes drilling, building, and equipping these wells to store and recover treated surface water. The document outlines general terms and conditions for construction contracts, covering definitions, contract time, correlation of documents, availability of lands, physical conditions, bonds and insurance, contractor responsibilities, work by others, owner responsibilities, consultant status, changes in work, contract price, contract time, quality of work, payments, suspension, termination, dispute resolution, wage rates, measurements, utilities, traffic control, project signs, affirmative action, and compliance with storm drainage and air quality requirements.
Progress payments are applied for using a specific form. Electronic payments are accepted. Interest may be applied to late payments.
The contract includes a warranty and guarantee clause. There is a one-year correction period for defective work.
Liquidated damages may apply for failure to complete the project on time.
Visits to the site by the owner's representative are mentioned as part of the consultant's role during construction.
The contractor is responsible for shop drawings and samples.
Failure to pay minimum wage can lead to termination of the contract.