Lot 1: Color audio/video recording, pre & post construction
Lot 2: Clearing and grubbing
Lot 3: TRENCH EXCAVATION AND BACKFILL - ZERO FEET ( 0 feet) TO TEN FEET ( 10')
Lot 4: Trench excavation and backfill - zero feet ( 0') to fifteen feet ( 15')
Lot 5: Trench excavation and backfill - zero feet ( 0') to twenty feet ( 20')
Lot 6: Hydrostatic pressure test
Lot 7: Sanitary sewer pipe ( 8- inch pvc - sdr 26)
Lot 8: Sanitary sewer pipe ( 12- inch pvc - sdr 26)
Lot 9: Sanitary sewer pipe ( c900) ( 8- inch pvc - sdr 25)
Lot 10: Sanitary sewer pipe ( c900) ( 12- inch pvc - sdr 25)
Lot 11: Trenchless construction ( 8- inch hdpe - dr 13. 5)
Lot 12: Sewer service connection
Lot 13: Sewer service line
Lot 14: Re- route private sewer line
Lot 15: Abandoning sewer
Lot 16: Pipe bursting ( 10- inch to 12- inch hdpe - dr 13. 5)
Lot 17: Sewer flow control
Lot 18: Point repair
Lot 19: Deflection test (
Lot 20: Television inspection ( cctv) ( pre & post construction)
Lot 21: Sewer leakage test (
Lot 22: ( 4- ft) sanitary sewer manhole - zero feet ( 0') to six feet ( 6')
Lot 23: Extra depth manhole ( 4- feet)
Lot 24: Manhole testing (
Lot 25: Sanitary sewer manhole rehabilitation
Lot 26: Abandoning manhole
Lot 27: Removing manhole
Lot 28: Steel casing pipe ( 12- inch carrier pipe)
Lot 29: Bore and steel encasement ( 12- inch carrier pipe)
Lot 30: Construction staking ( construction survey)
Lot 31: Gps " as- built" survey
Lot 32: Construction signing and traffic control
Lot 33: Mobilization
Lot 34: Structure removal ( sanitary sewer pipe)
Lot 35: Pavement cut and permanent repair ( conc. )
Lot 36: Remove and replace driveway ( 6- inch)
Lot 37: Temporary erosion control
Lot 38: Solid slab sodding