City Of Hastings - NE
Hastings SE Water Main Improvement Phase 2 HU 2026- 12 - Hastings Southeast Water Main Improvement Phase 2 HU 2026- 12
Water Main Improvement 4 service saddles. 5 corporation stops. 6 curb stop and box. 7 **** thrust **** machine **** steel **** casing **** casing end **** **** horizontal directional drill hdd. 4. 204 **** pipe **** installation of water mains and service **** fire hydrants and valve **** cleaning, disinfection, flushing and pressure testing of water **** separation from sanitary sewer **** trench **** trench wall **** encasement **** pipe **** water **** valves and **** hydrants. 4. 305 **** boring and **** hydrant **** valve box **** extra depth excavation and hdd. 4. 310 tracer **** service **** water service **** curb stop.