Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e-
procurement system. Actual Contract Amount must be entered on "
Official Bid Document" and submitted as an attachment in the e-
procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire
Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** The project consists of one site totaling 5 acres in size. A large slide has occurred just below the home and is currently active. Drainage is seeping through the slide area and is causing the slope to stay fully saturated. The homeowner has tried to stabilize the slope by installing jersey barriers and ECB on the slope but it continues to move. In addition to this slide, drainage from a deep mine is daylighting from the slope just
above the home and causing the yard and house seat to stay saturated. Reclamation plans will include stabilizing the slope below the home with a gabion retaining wall and subdrain to transport drainage to the roadside ditch. Drainage
above the home will be captured in a pipe and transported to an excavated rock ditch over the slope, where the drainage is currently flowing. Subsurface drainage will be collected with a subdrain and will also daylight into the excavated rock ditch. To protect the longevity of the subdrain and other features installed from the severely eroded slope
above, a concrete block wall will also be installed.