The contractor must provide all management, tools, supplies, equipment, parts, and labor necessary to maintain, repair, and inspect the aerial work platforms (AWP), mobile cranes and forklifts at Al Udeid Air Base, Qatar (AUAB). The period of performance is structured as a base year, followed by four 1-year option periods with an additional 6-month extension. The anticipated contract start date is March 1, 2026. The contractor must submit a Quality Control Program (QCP) within fourteen 14 days after contract award. The government will periodically evaluate the contractors performance in accordance with the governments quality assurance surveillance plan. The contractor shall submit a final hazardous material inventory report no later than ten 10 working days following the termination or completion of this contract.
The contractor shall correct all deficiencies during the service call repairs whenever possible or within a maximum of three 3 calendar days. The contractor shall correct all deficiencies during the service call repairs whenever possible or within a maximum of three 3 calendar days.
All corrective maintenance actions performed by the contractor, including both workmanship and any replacement parts, shall be warrantied by the contractor for a period of twelve 12 months from the date of the governments acceptance of the completed repair. all corrective maintenance actions performed by the contractor, including both workmanship and any replacement parts, shall be warrantied by the contractor for a period of twelve 12 months from the date of the governments acceptance of the completed repair.
All firms must be registered with the system for award management (SAM) in order to receive award. all firms must be registered with the system for award management sam in order to receive award.
The contractor shall ensure that all aerial work platforms, mobile cranes, and forklifts undergo annual load tests and certifications. he contractor shall ensure that all aerial work platforms, mobile cranes, and forkliftsundergo annual load tests and certifications.
Failing to meet the performance measure as outlined in the services summary (SS) for any of these performance objectives in any one-month period shall result in a warning or corrective action report (CAR) from the COR. failing to meet the performance measure as outlined in the ss of these performance objectives in any combination for any two, or more consecutive or non consecutive months during a contract period shall constitute an immediate progress meeting with the multifunctional team mft.
Questions will close February 5th at 7:00 AM EST. questions will close february 5th at 7: 00am est