City Of Lenoir-NC
Lenoir Fire Department Infrastructure Repair
Lenoir Fire Department Infrastructure Repair The project will replace and realign approximately 420 linear feet of 42inch corrugated metal pipe cmp with 42 reinforced concrete pipe rcp along with 5 drainage structures. This project will abandon approximately 210 linear feet of existing 42inch cmp and 265 linear feet of 8 sanitary sewer pipe. Soil grout and miscellaneous grading will be required to repair the sinkhole. Foundation protection will be installed on the north side of the fire department building.
Bid Close Date: