Virginia Department Of Energy
Halfway Branch Landslide II- The work to be performed under the terms of this Specification consists of replacing an existing retaining wall to the rear of the residence. Overhead utilities will need to be relocated to minimize potential conflicts during construction. The removed wall will be taken to the disposal area. The drainage ditch at the top of the slope behind the residence will be regraded to make sure the ponding of water does not occur. Underdrains will be installed to move water away from the s
Bid Close Date: