Lot 3: Asphalt paving install asphalt apron for proposed parking lot per plans and specs.
Lot 4: Depressed curb install depressed curb between lot and apron per plans and specs.
Lot 1: General requirements includes all work associated with mobilization, demobilization, safety/hazard prevention, traffic control, housekeeping and final clean- up, field engineering, temporary utilities, storage and marshalling yards, permits, soil erosion and sediment control measures, insurance and bonding.
Lot 2: Concrete curb replacement remove existing curb, install njdot curb per plans and specs. Remove excess dirt behind existing curb and regrade at 5: 1 slope
Lot 3: Asphalt paving install asphalt apron for proposed parking lot per plans and specs.
Lot 4: Depressed curb install depressed curb between lot and apron per plans and specs.
Lot 5: Parking lot install pervious stone parking lot in existing grass field, per plans and specs. All excavated cut shall be transferred 5 miles to the thompson park maintenance area.
Lot 6: Signage install 24" stop bar and ( 1) 18" r1- r stop sign per plans and specs.
Lot 7: Allowance- for concealed or unforeseen conditions as directed by the owner.