City Of Rock Island - IL
Invitation to bid EDPL 32- 2025 Beachler
roofing, framing, insulation Cut new 2x6 rafters that fit correctly to the ridge and onto top plate alongside of the existing rafters that was replaced. these rafters will need to be screwed sistering the new to the existing. three screws per 16 on center the entire length of the rafter. add collar ties 13 down from the top of the ridge on all the rafters using 3 screws per side. Remove existing shingles from the roof down to the roof sheathing. Install that ice and snow guard in all of the valleys and lower edges of the roofline. Install approved water barrier over the remain roof sheathing. Install new 2 style d roof edging throughout. Install 35year architectural shingles of the homeowners choice. Install a shingle over ridge vent following manufactures instruction. Install new plumbing flashing boots, extend the plumbing vents if less the 12 on the shallow side. Install all head flashing and new step flashing at the wall lines. Install new seamless 6 gutters on the overhangs with a minimum of per foot of
Bid Close Date: