City Of Reno
**** & **** - Eagle Ridge & S. Dakota Lift Stations Improvement Project - PWP No. WA- 2026- 195 - USD- 2026- 01 The partial rehabilitation of the Eagle Ridge and South Dakota Lift Stations. The Eagle Ridge Lift Stationscope includes removal of the existing above grade fiberglass vault; removal and replacement of existing pumps; epoxy coating of existing wet well; installation of a new valve vault, valves, and flow meter; electrical improvements to relocate existing pump controls; site lighting install
Eagle Ridge & South Dakota Lift Stations Improvement Project The partial rehabilitation of the eagle ridge and south dakota lift stations. the eagle ridge lift stationscope includes removal of the existing above grade fiberglass vault removal and replacement of existing pumps epoxy coating of existing wet well installation of a new valve vault, valves, and flow meter electrical improvements to relocate existing pump controls site lighting installation and othermiscellaneous work as described in the plans and specifications. the south dakota lift station scope includes dewatering removal and replacement of existing bypass connection piping installation of new drain lines for bypass connection manhole and valve vault electrical improvements to bring motor cable disconnects above grade and other miscellaneous work as described in the plans and specifications.
Bid Close Date: