Veterans Affairs, Department Of- Veterans Affairs, Department Of- 262- Network Contract Office 22 ( 36C262)
J045-- PMI Semi /annual Boiler Inspection - w/wd, Base 4, POP 3/1/2026 - 2/28/2031 - Annual PMI Pressure Boilers
PMI Semi Annual Boiler Inspection WWD The contractor shall provide all labor, materials, tools, and equipment necessary to perform annual and semiannual inspections, maintenance, and safety testing on highpressure hp and lowpressure condensing boilers located at the carl t. hayden medical center. 6. 1 highpressure boilers building 2annual internal inspection: drain and wash boiler thoroughly. remove manhole and handhole plates replace seals. inspect waterside and fireside conditions. remove grates and brickwork insulation as needed replace seals and brickwork if required. annual maintenance: inspect furnace, internal surfaces, closures, and accessories. inspect exterior casing, supports, valves, and controls. clean waterside and fireside repair refractory. calibrate pressure gauges and thermometers. semiannual safety device testing: burner combustion settings and oxygen trim calibration. safety valves lift and accumulation tests. gas and fuel oil safety shutoff valves proof of closure and leak tests. interloc
Bid Close Date: