BidHits®

Wire Splice Government Bids & RFPs

Government bid alerts, regional filters, and fast access to documents

90% recommend BidHits (1119 real users, 11/13/2026). Methodology

USA | CO | PUEBLO COUNTY

City And County Of Denver Department Of Transportation And Infrastructure

La Alma Lincoln Improvements La Alma- Lincoln Park is a historic 15. 4- acre park located within Denver&# 39; s La Alma- Lincoln Park neighborhood and designated Historic Cultural District. As one of Denver&# 39; s most culturally significant public spaces, the park serves as a center for recreation, community gathering, cultural expression, and neighborhood identity. The City and County of Denver is undertaking a comprehensive renovation of the park to modernize aging infrastructure, improve accessibility

Bid Close Date:

Lot 142: Wire Splice Boxes

Lot 152: Removal of control valves, quick coupler valves, gate valves, manual drain valves, master valve, wire splices, and valve boxes

Lot 1: Construction Fence 6' chain link

Lot 2: Tree Retention and Protection Fencing - 48' orange plastic safety fencing

Lot 3: Air Spade

Lot 4: Cambistat treatment prior to construction on existing trees

Lot 5: Erosion and Sediment Control

Lot 6: Demolition - Remove existing trees

Lot 7: Remove Concrete

Lot 8: Remove Asphalt

Lot 9: Remove Fence

Lot 10: Remove Signs

Lot 11: Remove Curb and Gutter

Lot 12: Clearing and Grubbing

Lot 13: Goric Half Euroflex Balls - Small

Lot 14: Goric Half Euroflex Balls - Medium

Lot 15: Goric Half Euroflex Balls - Large

Lot 16: Landscape Structures Play Package

Lot 17: Playground Fencing

Lot 18: VIP2. 0 Swing

Lot 19: In- ground Bouncers - Unit, Freight and Install

Lot 20: Log Stump /Stepper Edger

Lot 21: DPR Repurposed Logs

Lot 22: Tennis Striping

Lot 23: Tennis Nets

Lot 24: Basketball Striping

Lot 25: Basketball Goals

Lot 26: Fitness Relocate and Reinstall

Lot 27: Earthmoving ( Cut+ Fill)

Lot 28: Unclassified Fill

Lot 29: Curb and Gutter

Lot 30: ADA Ramp in ROW

Lot 31: ADA Ramp in Parking Lot

Lot 32: Asphalt Patch

Lot 33: Parking Lot Striping

Lot 34: Parking Lot Signage

Lot 35: Concrete ( 6" thick) - Basketball Court

Lot 36: Concrete ( 6" thick)

Lot 37: Concrete ( 6" thick) Tine Finish

Lot 38: Concrete Sandblast

Lot 39: Concrete ( plaza accent)

Lot 40: Concrete ( amphitheater accent)

Lot 41: Concrete ( firelane accent)

Lot 42: Concrete ( roller loop trowel finish)

Lot 43: Tennis Court

Lot 44: CIP Concrete Stairs 15' W

Lot 45: Stair Handrail, Painted

Lot 46: ADA Ramp Handrail

Lot 47: Crusher Fines Paving

Lot 48: Concrete - Edger ( Mow Curb)

Lot 49: Concrete - Playground Edger

Lot 50: Concrete - Turndown at Playpits

Lot 51: Synthetic Lawn Play Surfacing, Includes Infill

Lot 52: Playground - EWF Play Surface, ( 12" depth min. )

Lot 53: Truncated Domes

Lot 54: Skatepark Contractor General Conditions

Lot 55: Fine Grading

Lot 56: Aggregate Base

Lot 57: Formwork/Lumber/Misc. Harware

Lot 58: Steel Reinforcing

Lot 59: Coping/Edging

Lot 60: Shotcrete/Concrete

Lot 61: Chain Link Fencing - Softball - 10' H

Lot 62: Chain Link Fencing - Softball - 10' H VEHICULAR ACCESS GATE

Lot 63: Chain Link Fencing - Softball - 20' H

Lot 64: Chain Link Fencing - Tennis

Lot 65: Chain Link Fencing - Tennis VEHICULAR ACCESS GATE

Lot 66: Dumpster Enclosure

Lot 67: Furn- Tennis Player Bench

Lot 68: Furn- DPR Rules and Regs Sign

Lot 69: Furn- DPR Armed Bench

Lot 70: Furn- DPR Grill

Lot 71: Furn- SP Curved Community Table

Lot 72: Furn- DPR Picnic Table

Lot 73: Furn- DPR Bike Rack

Lot 74: Furn- DPR Ash Bin

Lot 75: Furn- DPR Removable Bollard

Lot 76: Furn- DPR Vehicle Control Gate

Lot 77: Furn- Reclaimed Concrete Block Benches

Lot 78: Stone Masonry demo

Lot 79: Concrete Demo

Lot 80: Cast- In- Place Concrete ( flatwork)

Lot 81: Masonry Cleaning

Lot 82: Graffiti removal

Lot 83: Historic Stone Masonry Repair ( incl stage)

Lot 84: Historic Stone Masonry Repointing

Lot 85: New Stone Masonry Walls

Lot 86: New Stone masonry Steps

Lot 87: New handrail at existing ramp

Lot 88: 8" Concrete Curb

Lot 89: 18" Concrete Seat Wall

Lot 90: 24" Concrete Curved Seat Walls W/Tile + Lettering

Lot 91: 24" CIP Wall with Sandstone Masonry Veneer and Cap

Lot 92: Terrace Seating

Lot 93: Reclaimed Stone Slabs Vertical

Lot 94: Stone Curb Transition

Lot 95: Reclaimed Stone Curb/Apron

Lot 96: Cobble Swale

Lot 97: Story Wall Bronze Sign Plaque

Lot 98: Street Signs

Lot 99: Tennis Court Sport Lighting - DPR Maintained

Lot 100: Basketball Court Sport Lighting - DPR Maintained

Lot 101: La Alma Plaza Pavilion Power and Lighting - DPR Maintained

Lot 102: La Alma Plaza Pavilion

Lot 103: Sandstone Blocks

Lot 104: Soil Preparation - ( 6" depth)

Lot 105: Wood Mulch

Lot 106: Shrubs - 1 GAL Typ.

Lot 107: Sodding

Lot 108: Seeding - No Mow

Lot 109: Seeding - Low Grow

Lot 110: Seeding - Upland Mix 1

Lot 111: Seeding - Upland Mix 2

Lot 112: Seeding - Water Quality

Lot 113: Deciduous Tree, ( 2" cal. )

Lot 114: Ornamental Tree, ( 2" cal. )

Lot 115: Conifer Tree

Lot 116: Landscape Maintenance

Lot 117: Hunter Rotors ( I20- SS - 6")

Lot 118: Hunter Rotors ( I20 - 12")

Lot 119: Rain Bird Pop- ups ( 6" w/MPR Nozzle)

Lot 120: Rain Bird Pop- ups ( 12" w/MPR Nozzle)

Lot 121: Rain Bird Pop- ups ( 12" w/MP Rotators)

Lot 122: Hunter Electric Control Valve Assembly - 2"

Lot 123: Hunter Electric Control Valve Assembly - 1. 5"

Lot 124: Hunter Electric Control Valve Assembly - 1"

Lot 125: Control Valve Riser Assembly with Valve Box

Lot 126: 1" Manual Drain Assembly

Lot 127: 1" Quick Coupler Valve

Lot 128: 3" Gate Valve

Lot 129: 4" Gate Valve

Lot 130: 4" PVC Mainline

Lot 131: 3" PVC Mainline

Lot 132: 1" PVC Lateral Line

Lot 133: 1- 1/2" PVC Lateral Line

Lot 134: 2" PVC Lateral Line

Lot 135: 2- 1/2" PVC Lateral Line

Lot 136: 1" Poly Lateral Line

Lot 137: 1- 1/2" Poly Lateral Line

Lot 138: 2" Poly Lateral Line

Lot 139: 2- 1/2" Poly Lateral Line

Lot 140: # 14 AWG Control Wire

Lot 141: # 12UFUL Tracer Wire

Lot 142: Wire Splice Boxes

Lot 143: 2" PVC Sleeve

Lot 144: 4" PVC Sleeve

Lot 145: 6" PVC Sleeve

Lot 146: 8" PVC Sleeve

Lot 147: 2" PVC Sleeve - Bored

Lot 148: 8" HDPE Sleeve - Bored

Lot 149: Host Controller Replacement

Lot 150: Communicating Controller Replacement

Lot 151: Removal of existing heads

Lot 152: Removal of control valves, quick coupler valves, gate valves, manual drain valves, master valve, wire splices, and valve boxes

Lot 153: Removal of existing backflow preventer

Lot 154: Removal of existing copper tubing, mainline and control wire

Lot 155: Removal of existing tap & meter

Lot 156: Sod Restoration ( 6" wide trenches)

Lot 157: Lowering of Water Service Line - Point of Connection

Lot 158: 4" PVC Storm Sewer

Lot 159: 6" PVC Storm Sewer

Lot 160: 8" PVC Storm Sewer

Lot 161: 10" PVC Storm Sewer

Lot 162: Storm Sewer Trench Drain

Lot 163: Storm Cleanouts ( outside of rain gardens

Lot 164: Storm Connection to Existing inlet

Lot 165: Rain Garden Inlet Strucutures

Lot 166: Rain Garden Cleanouts

Lot 167: Rain Garden Area Drains

Lot 168: Rain Garden 4" PVC

Lot 169: Rain Garden 4" Perforated PVC

Lot 170: Rain Garden Growing Media

Lot 171: Rain Garden Sand Filter Material

Lot 172: Rain Garden Gravel Material

Lot 173: Mobilzation and Demobilization ( includes construction survey)

Lot 174: Description Price 02 41 00

Lot 175: Selective Demo

Lot 176: Tree Pruning

Lot 177: Wheel Stops

Lot 178: Traffic Control

Lot 179: 3rd Party Materials Testing

Lot 180: Permitting, Environmental Oversight

Lot 181: Description UOM Qty 11 68 00

Lot 182: ADD ALT 1: We Go Round Spinner

Lot 183: Description UOM Qty 32 13 13

Lot 184: Add alt 2: concrete ( plaza accent) - sand finish

Lot 185: Description UOM Qty 32 13 13

Lot 186: Add alt 3: concrete ( amphitheater accent) - sand finish

Lot 187: Description UOM Qty 32 13 13

Lot 188: Add alt 4: concrete ( firelane accent) - exposed sand finish

Lot 189: Description UOM Qty 32 13 13

Lot 190: Add alt 5: concrete ( wavy track trowel finish)

USA | KY | FRANKLIN COUNTY | FRANKFORT Small City

Commonwealth Of Kentucky - Transportation - Office Of The Secretary - KY

Eq Rental Offset Drill w/Operator D- 9 - Federal

EQ rental offset drill with operator for federal slide repair project Rental of modified rotary drill with operator, truck mounted, capable of drilling 7- 10 inch diameter holes 40 feet into soil and rock, offset drilling minimum 5 feet from tire edge, 15 degree slope, mast jib to lift steel railroad rails up to 40 feet and 2, 000 pounds, minimum 150 HP motor, 300 CFM compressor, 16, 000 pounds pull down pressure; used railroad rail supply and installation; excavation; backfill material and geotextile fabric; cribbing installation; traffic control flagging; laborer services; bucket truck with operator

Bid Close Date:

Lot 1: See Specifications Section 1. 00 ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. See attached document How to Respond to an Online Bid through the Kentucky Vendor Self Service site ( updated). pdf. Please enter contact person, phone number and email in the Comments Section. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.

Lot 2: Vendor supplied traffic control for drilled railroad rail drilling operation; Vendor shall provide flagging when requested. If Department provides traffic control, the flagging line item will not be included on the individual Delivery Order for Offset Drill with Operator. Item includes the appropriate number of flaggers for traffic control on the worksite. Each flagger will be paid at the hourly rate. With permission from the Engineer, the vendor may elect to use temporary traffic signals or portable traffic signals with appropriate signing in accordance with MUTCD or as directed by the Engineer. Vendor must also place and maintain appropriate work zone signing, flagger signs, flagger paddles, etc. in accordance with the MUTCD or as directed by the Engineer. Flagmen are required to wear appropriate safety equipment and must stay in constant communication with one another. Flaggers must work in accordance with Kentucky Dept of Highways Standard Drawings, in accordance with the MUTCD, and comply with Section 112 of the current Standard Specifications for Road and Bridge Construction at all times. Lane closures will only be permitted during daytime hours unless approved by the engineer. Payment will be made for the total number of man- hours worked for supplied traffic control each day. If vendor supplies portable traffic signals, payment by the man- hour will be based on number of man- hours flaggers would have been utilized instead of portable signals.

Lot 3: Vendor to provide used railroad rail. To be completed as stated in the extended description line 1 with the vendor providing the necessary used railroad rail. Use recycled ( used) railroad rails classified with a nominal weight of 130 lb/yd ( pounds per yard) size or greater. Use only visibly straight recycled rails with no splices. The Engineer will verify rail nominal weights ( manufacturer' s stamp with lb/yd, date, etc. ). Provide certification for nominal weight if the manufacturer' s stamp is unidentifiable.

Lot 4: Vendor to install cribbing at slide location as directed by the Engineer. Extend wall cribbing 2 feet to 16 feet as directed by Engineer below the existing ground line. If bedded rock is encountered, install the cribbing to the bedded rock only. The engineer will direct changes if necessary to the procedure. Vendor to furnish all labor and equipment to deliver and install wall cribbing on the recycled ( used) railroad rail piling. Wall cribbing shall be lapped, bolted, and attached solid to the drilled railroad rails. Use wall cribbing: recycled ( used) steel " w" beam guardrail shall be supplied by the KY Dept. of Transportation. Bolts, tie wire, welding, etc. needed to make the cribbing panels and attach to the drilled railroad rails will be furnished by the vendor. The Vendor is responsible for picking up the ( used) steel " W" beam guardrail at the local county Maintenance garage. Any unused ( used) steel " W" beam guardrail shall be returned to the maintenance garage by the vendor.

Lot 5: Perform excavation as the slide repair dictates or as directed by the Engineer. Excavate each slide repair area to provide a platform for drilling the used railroad rails, if necessary. Excavate material as directed by the engineer wide enough to place cribbing and enough area for granular backfill. Equipment shall be capable of excavating a vertical trench to install cribbing up to 16 feet in depth from the roadway elevation. Method of excavation shall limit the damage or removal of the existing roadway pavement as much as possible. Excavating equipment bucket size and width shall be adjusted as directed by the engineer to achieve the excavation without damaging the pavement, utilities, drill steel, etc. Do not use excavated material from the site as fill material. If directed by the Engineer, additional excavation may be required to remove slide material from the roadway in order to maintain traffic or to eliminate the pavement break for future asphalt paving. Unless directed by the Engineer, excess excavation may be wasted at sites on the right- of- way, only if approved by the Engineer. Material may not be wasted in flood prone areas or in streams. If the Engineer deems no suitable sites are available within the right- of- way, the contractor will be required to waste excess material off the right- of- way at sites obtained by the contractor at no cost to the KY Dept. of Transportation. Excavation will be paid by field measurement.

Lot 6: Vendor to furnish backfill material. Place Geotextile fabric as directed by the engineer, the geotextile fabric shall be lapped as outlined by the manufacture recommendations and Kentucky Standard Specifications. The geotextile fabric shall wrap the granular backfill to provide separation from all earth embankment. Construct granular embankment behind railroad rails, cribbing and on slope, as per Section 206 of the Kentucky Standard Specifications for Road and Bridge Construction, Current Edition. Backfill material shall be placed and compacted to eliminate voids. Construct embankment up to the approximate existing pavement elevation. Use the following backfill materials: Kentucky aggregate gradation no. 2' s /23' s or larger to the bottom of pavement elevation and place DGA Base from the bottom of the pavement elevation to the top of the existing pavement separated with Geotextile fabric as directed by the engineer. Backfill material shall meet requirements of Section 805 of the Kentucky Standard Specifications for Road and Bridge Construction, Current Edition. Backfill material delivered to the project, will only be accepted with a certified weigh ticket. A conversion factor of 1. 3 tons per cubic yard will be used to pay for all gradations of aggregate Backfill material delivered to the project. The Engineer will use visual inspection and/or material testing, as applicable to determine acceptability. Geotextile fabric shall be provided by the vendor. Vendor to furnish backfill material and labor to install geotextile fabric.

Lot 7: Vendor furnished laborer to trim tree limbs, extend Department furnished culvert pipe through crib wall, and taking down guardrail and stacking for the Department to pick up. The Department will be responsible for picking guardrail up and delivering to maintenance facility.

Lot 8: Vendor furnished bucket truck with operator capable of clearing tree limbs for a 40 feet drill mast. Vendor operator must be properly trained for the bucket truck operations and wear the appropriate safety equipment.

Lot 9: Vendor is to furnish and Install TY IV filter fabric for separation of the Backfill Material and Roadway Material. Payment per SQYD will include all labor, materials, and incidentals necessary to correctly install filter fabric in the slide area.

Lot 10: Vendor to furnish and install cribbing at slide location as directed by the Engineer. Vendor furnished cribbing must be galvanized guardrail, reinforced concrete panels, or equivalent material as approved by the engineer. The cribbing material must be corrosion resistant and be capable of holding backfill material across a span of 3 to 4 feet. Extend wall cribbing 2 feet to 16 feet as directed by Engineer below the existing ground line. If bedded rock is encountered, install the cribbing to the bedded rock only. The engineer will direct changes if necessary to the procedure. Vendor to furnish all labor and equipment to deliver and install wall cribbing on the recycled ( used) railroad rail piling. Wall cribbing shall be lapped, bolted, and attached solid to the drilled railroad rails. Bolts, tie wire, welding, etc. needed to make the cribbing panels and attaching to the drilled railroad rails will be furnished by the vendor.

Lot 11: Vendor furnished cribbing material must be galvanized guardrail. The guardrail shall be delivered and paid in 12. 5 LF sections. 25 LF guardrail sections will be considered /accepted upon the engineer' s approval. The guardrail material must be corrosion resistant, hole punched as shown for standard guardrail installation, and straight. KYTC will unload the material. Minimum order of 5, 625 Sq. Ft. MODIFIED ROTARY DRILL WITH OPERATOR( S). DRILL TO BE TRUCK MOUNTED AND CAPABILITY OF DRILLING 7" TO 10" DIAMETER HOLES 40 FEET INTO SOIL AND ROCK. ROTARY DRILL MUST HAVE CAPACITY OF DRILLING OFFSET A MINIMUM OF FIVE ( 5) FEET FROM THE EDGE OF THE TIRE TO THE CENTER OF THE HOLES, DRILLING FROM EITHER SIDE OF THE CARRIER AND ON A 15% SLOPE. MAST JIB SHALL BE ABLE TO LIFT AND DROP INTO THE HOLES, STEEL RAILROAD RAILS UP TO 40 FEET IN LENGTH AND WEIGHING UP TO 2, 000 POUNDS. DRILL SHALL HAVE A MINIMUM 150 H. P. MOTOR AND AT LEAST A 300 CFM COMPRESSOR CAPABLE OF 16, 000 POUNDS OF PULL DOWN PRESSURE. PAYMENT WILL BE MADE ON THE PART OF THE RAIL THAT IS SATISFACTORILY PLACE BELOW GROUND LEVEL. NO PAYMENT WILL BE MADE FOR THE PART OF THE RAIL EXTENDING ABOVE THE HOLE. CONTRACTOR IS RESPONSIBLE FOR CUTTING ANY RAILROAD STEEL THAT IS NOT FLUSH WITH THE ESTIMATED FINISHED SHOULDER AFTER BEING DROPPED INTO DRILLED HOLES. CONTRACTOR MUST BE ABLE TO DRILL AND INSTALL 800 FT OF RAILROAD STEEL PER 8 HOUR WORKDAY. LEEWAY WILL BE GIVEN FOR WEATHER AND UNFORSEEN CIRCUMSTANCES AT THE DEPARTMENTS DISCRETION. THE TRANSPORTATION CABINET SHALL PROVIDE RAILROAD RAILS, MAKE NECESSARY SITE PREPARATION AND FURNISH NECESSARY TRAFFIC CONTROL.

Lot 12: Modified rotary drill with operator( s). Drill to be truck mounted and capability of drilling 7" to 10" diameter holes 40 feet into soil and rock. Rotary drill must have capacity of drilling offset a minimum of five ( 5) feet from the edge of the tire to the center of the holes, drilling from either side of the carrier and on a 15% slope. Mast jib shall be able to lift and drop into the holes, steel railroad rails up to 40 feet in length and weighing up to 2, 000 pounds. Drill shall have a minimum 150 h. P. Motor and at least a 300 cfm compressor capable of 16, 000 pounds of pull down pressure. Payment will be made on the part of the rail that is satisfactorily place below ground level. No payment will be made for the part of the rail extending above the hole. Contractor is responsible for cutting any railroad steel that is not flush with the estimated finished shoulder after being dropped into drilled holes. Contractor must be able to drill and install 800 ft of railroad steel per 8 hour workday. Leeway will be given for weather and unforseen circumstances at the departments discretion. The transportation cabinet shall provide railroad rails, make necessary site preparation and furnish necessary traffic control.

Lot 13: Vendor to provide used railroad rail. This includes drilling the hole, providing and placing the rail. Use only visibly straight recycled rails with no splices. The Engineer will verify rail nominal weights ( manufacturer' s stamp with lb/yd, date, etc. ). Provide certification for nominal weight if the manufacturer' s stamp is unidentifiable. This line item shall be used for all work paid using FEDERAL funds. MODIFIED ROTARY DRILL WITH OPERATOR( S). DRILL TO BE TRUCK MOUNTED AND CAPABILITY OF DRILLING 7" TO 10" DIAMETER HOLES 40 FEET INTO SOIL AND ROCK. ROTARY DRILL MUST HAVE CAPACITY OF DRILLING OFFSET A MINIMUM OF FIVE ( 5) FEET FROM THE EDGE OF THE TIRE TO THE CENTER OF THE HOLES, DRILLING FROM EITHER SIDE OF THE CARRIER AND ON A 15% SLOPE. MAST JIB SHALL BE ABLE TO LIFT AND DROP INTO THE HOLES, STEEL RAILROAD RAILS UP TO 40 FEET IN LENGTH AND WEIGHING UP TO 2, 000 POUNDS. DRILL SHALL HAVE A MINIMUM 150 H. P. MOTOR AND AT LEAST A 300 CFM COMPRESSOR CAPABLE OF 16, 000 POUNDS OF PULL DOWN PRESSURE. PAYMENT WILL BE MADE ON THE PART OF THE RAIL THAT IS SATISFACTORILY PLACE BELOW GROUND LEVEL. NO PAYMENT WILL BE MADE FOR THE PART OF THE RAIL EXTENDING ABOVE THE HOLE. CONTRACTOR IS RESPONSIBLE FOR CUTTING ANY RAILROAD STEEL THAT IS NOT FLUSH WITH THE ESTIMATED FINISHED SHOULDER AFTER BEING DROPPED INTO DRILLED HOLES. CONTRACTOR MUST BE ABLE TO DRILL AND INSTALL 800 FT OF RAILROAD STEEL PER 8 HOUR WORKDAY. LEEWAY WILL BE GIVEN FOR WEATHER AND UNFORSEEN CIRCUMSTANCES AT THE DEPARTMENTS DISCRETION. THE TRANSPORTATION CABINET MAKE NECESSARY SITE PREPARATION AND FURNISH NECESSARY TRAFFIC CONTROL.

USA | KY | FRANKLIN COUNTY | FRANKFORT Small City

Commonwealth Of Kentucky - Transportation - Office Of The Secretary - KY

Eq Rental Offset Drill w/Operator D- 9 - State

EQ rental offset drill with operator D9 state Rental of road and highway equipment not otherwise classified, including offset drill with operator, traffic control flagging, used railroad rail, cribbing installation, excavation, backfill material, geotextile fabric, laborer services, bucket truck with operator, and filter fabric installation

Bid Close Date:

Lot 1: See Specification Section 1. 00 ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. See attached document How to Respond to an Online Bid through the Kentucky Vendor Self Service site ( updated). pdf. Please enter contact person, phone number and email in the Comments Section. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correc

Lot 2: Vendor supplied traffic control for drilled railroad rail drilling operation; Vendor shall provide flagging when requested. If Department provides traffic control, the flagging line item will not be included on the individual Delivery Order for Offset Drill with Operator. Item includes the appropriate number of flaggers for traffic control on the worksite. Each flagger will be paid at the hourly rate. With permission from the Engineer, the vendor may elect to use temporary traffic signals or portable traffic signals with appropriate signing in accordance with MUTCD or as directed by the Engineer. Vendor must also place and maintain appropriate work zone signing, flagger signs, flagger paddles, etc. in accordance with the MUTCD or as directed by the Engineer. Flagmen are required to wear appropriate safety equipment and must stay in constant communication with one another. Flaggers must work in accordance with Kentucky Dept of Highways Standard Drawings, in accordance with the MUTCD, and comply with Section 112 of the current Standard Specifications for Road and Bridge Construction at all times. Lane closures will only be permitted during daytime hours unless approved by the engineer. Payment will be made for the total number of man- hours worked for supplied traffic control each day. If vendor supplies portable traffic signals, payment by the man- hour will be based on number of man- hours flaggers would have been utilized instead of portable signals.

Lot 3: Vendor to provide used railroad rail. To be completed as stated in the extended description line 1 with the vendor providing the necessary used railroad rail. Use recycled ( used) railroad rails classified with a nominal weight of 130 lb/yd ( pounds per yard) size or greater. Use only visibly straight recycled rails with no splices. The Engineer will verify rail nominal weights ( manufacturer' s stamp with lb/yd, date, etc. ). Provide certification for nominal weight if the manufacturer' s stamp is unidentifiable.

Lot 4: Vendor to install cribbing at slide location as directed by the Engineer. Extend wall cribbing 2 feet to 16 feet as directed by Engineer below the existing ground line. If bedded rock is encountered, install the cribbing to the bedded rock only. The engineer will direct changes if necessary to the procedure. Vendor to furnish all labor and equipment to deliver and install wall cribbing on the recycled ( used) railroad rail piling. Wall cribbing shall be lapped, bolted, and attached solid to the drilled railroad rails. Use wall cribbing: recycled ( used) steel " w" beam guardrail shall be supplied by the KY Dept. of Transportation. Bolts, tie wire, welding, etc. needed to make the cribbing panels and attach to the drilled railroad rails will be furnished by the vendor. The Vendor is responsible for picking up the ( used) steel " W" beam guardrail at the local county Maintenance garage. Any unused ( used) steel " W" beam guardrail shall be returned to the maintenance garage by the vendor.

Lot 5: Perform excavation as the slide repair dictates or as directed by the Engineer. Excavate each slide repair area to provide a platform for drilling the used railroad rails, if necessary. Excavate material as directed by the engineer wide enough to place cribbing and enough area for granular backfill. Equipment shall be capable of excavating a vertical trench to install cribbing up to 16 feet in depth from the roadway elevation. Method of excavation shall limit the damage or removal of the existing roadway pavement as much as possible. Excavating equipment bucket size and width shall be adjusted as directed by the engineer to achieve the excavation without damaging the pavement, utilities, drill steel, etc. Do not use excavated material from the site as fill material. If directed by the Engineer, additional excavation may be required to remove slide material from the roadway in order to maintain traffic or to eliminate the pavement break for future asphalt paving. Unless directed by the Engineer, excess excavation may be wasted at sites on the right- of- way, only if approved by the Engineer. Material may not be wasted in flood prone areas or in streams. If the Engineer deems no suitable sites are available within the right- of- way, the contractor will be required to waste excess material off the right- of- way at sites obtained by the contractor at no cost to the KY Dept. of Transportation. Excavation will be paid by field measurement.

Lot 6: Vendor to furnish backfill material. Place Geotextile fabric as directed by the engineer, the geotextile fabric shall be lapped as outlined by the manufacture recommendations and Kentucky Standard Specifications. The geotextile fabric shall wrap the granular backfill to provide separation from all earth embankment. Construct granular embankment behind railroad rails, cribbing and on slope, as per Section 206 of the Kentucky Standard Specifications for Road and Bridge Construction, Current Edition. Backfill material shall be placed and compacted to eliminate voids. Construct embankment up to the approximate existing pavement elevation. Use the following backfill materials: Kentucky aggregate gradation no. 2' s /23' s or larger to the bottom of pavement elevation and place DGA Base from the bottom of the pavement elevation to the top of the existing pavement separated with Geotextile fabric as directed by the engineer. Backfill material shall meet requirements of Section 805 of the Kentucky Standard Specifications for Road and Bridge Construction, Current Edition. Backfill material delivered to the project, will only be accepted with a certified weigh ticket. A conversion factor of 1. 3 tons per cubic yard will be used to pay for all gradations of aggregate Backfill material delivered to the project. The Engineer will use visual inspection and/or material testing, as applicable to determine acceptability. Geotextile fabric shall be provided by the vendor. Vendor to furnish backfill material and labor to install geotextile fabric.

Lot 7: Vendor furnished laborer to trim tree limbs, extend Department furnished culvert pipe through crib wall, and taking down guardrail and stacking for the Department to pick up. The Department will be responsible for picking guardrail up and delivering to maintenance facility.

Lot 8: Vendor furnished bucket truck with operator capable of clearing tree limbs for a 40 feet drill mast. Vendor operator must be properly trained for the bucket truck operations and wear the appropriate safety equipment.

Lot 9: Vendor is to furnish and Install TY IV filter fabric for separation of the Backfill Material and Roadway Material. Payment per SQYD will include all labor, materials, and incidentals necessary to correctly install filter fabric in the slide area.

Lot 10: Vendor to furnish and install cribbing at slide location as directed by the Engineer. Vendor furnished cribbing must be galvanized guardrail, reinforced concrete panels, or equivalent material as approved by the engineer. The cribbing material must be corrosion resistant and be capable of holding backfill material across a span of 3 to 4 feet. Extend wall cribbing 2 feet to 16 feet as directed by Engineer below the existing ground line. If bedded rock is encountered, install the cribbing to the bedded rock only. The engineer will direct changes if necessary to the procedure. Vendor to furnish all labor and equipment to deliver and install wall cribbing on the recycled ( used) railroad rail piling. Wall cribbing shall be lapped, bolted, and attached solid to the drilled railroad rails. Bolts, tie wire, welding, etc. needed to make the cribbing panels and attaching to the drilled railroad rails will be furnished by the vendor.

Lot 11: Vendor furnished cribbing material must be galvanized guardrail. The guardrail shall be delivered and paid in 12. 5 LF sections. 25 LF guardrail sections will be considered /accepted upon the engineer' s approval. The guardrail material must be corrosion resistant, hole punched as shown for standard guardrail installation, and straight. KYTC will unload the material. Minimum order of 5, 625 Sq. Ft. MODIFIED ROTARY DRILL WITH OPERATOR( S). DRILL TO BE TRUCK MOUNTED AND CAPABILITY OF DRILLING 7" TO 10" DIAMETER HOLES 40 FEET INTO SOIL AND ROCK. ROTARY DRILL MUST HAVE CAPACITY OF DRILLING OFFSET A MINIMUM OF FIVE ( 5) FEET FROM THE EDGE OF THE TIRE TO THE CENTER OF THE HOLES, DRILLING FROM EITHER SIDE OF THE CARRIER AND ON A 15% SLOPE. MAST JIB SHALL BE ABLE TO LIFT AND DROP INTO THE HOLES, STEEL RAILROAD RAILS UP TO 40 FEET IN LENGTH AND WEIGHING UP TO 2, 000 POUNDS. DRILL SHALL HAVE A MINIMUM 150 H. P. MOTOR AND AT LEAST A 300 CFM COMPRESSOR CAPABLE OF 16, 000 POUNDS OF PULL DOWN PRESSURE. PAYMENT WILL BE MADE ON THE PART OF THE RAIL THAT IS SATISFACTORILY PLACE BELOW GROUND LEVEL. NO PAYMENT WILL BE MADE FOR THE PART OF THE RAIL EXTENDING ABOVE THE HOLE. CONTRACTOR IS RESPONSIBLE FOR CUTTING ANY RAILROAD STEEL THAT IS NOT FLUSH WITH THE ESTIMATED FINISHED SHOULDER AFTER BEING DROPPED INTO DRILLED HOLES. CONTRACTOR MUST BE ABLE TO DRILL AND INSTALL 800 FT OF RAILROAD STEEL PER 8 HOUR WORKDAY. LEEWAY WILL BE GIVEN FOR WEATHER AND UNFORSEEN CIRCUMSTANCES AT THE DEPARTMENTS DISCRETION. THE TRANSPORTATION CABINET SHALL PROVIDE RAILROAD RAILS, MAKE NECESSARY SITE PREPARATION AND FURNISH NECESSARY TRAFFIC CONTROL.

Lot 12: Modified rotary drill with operator( s). Drill to be truck- mounted and capability of drilling 7" to 10" diameter holes 40 feet into soil and rock. Rotary drill must have capacity of drilling offset a minimum of five ( 5) feet from the edge of the tire to the center of the holes, drilling from either side of the carrier and on a 15% slope. Mast jib shall be able to lift and drop into the holes steel railroad rails up to 40 feet in length and weighing up to 2, 000 pounds. Drill shall have a minimum 150 h. P. Motor and at least a 300 cfm compressor capable of 16, 000 pounds of pull down pressure. Payment will be made on the part of the rail that is satisfactorily placed below ground level. No payment will be made for the part of the rail extending above the hole. Contractor is responsible for cutting any railroad steel that is not flush with the estimated finished shoulder after being dropped into drilled holes. Contractor must be able to drill and install 800 ft of railroad steel per 8- hour workday. Leeway will be given for weather and unforeseen circumstances at the department' s discretion. The transportation cabinet shall provide railroad rails, make necessary site preparation and furnish necessary traffic control.

Lot 13: Vendor to provide used railroad rail. This includes drilling the hole, providing and placing the rail. Use only visibly straight recycled rails with no splices. The Engineer will verify rail nominal weights ( manufacturer' s stamp with lb/yd, date, etc. ). Provide certification for nominal weight if the manufacturer' s stamp is unidentifiable. This line item shall be used for all work paid using STATE funds. MODIFIED ROTARY DRILL WITH OPERATOR( S). DRILL TO BE TRUCK MOUNTED AND CAPABILITY OF DRILLING 7" TO 10" DIAMETER HOLES 40 FEET INTO SOIL AND ROCK. ROTARY DRILL MUST HAVE CAPACITY OF DRILLING OFFSET A MINIMUM OF FIVE ( 5) FEET FROM THE EDGE OF THE TIRE TO THE CENTER OF THE HOLES, DRILLING FROM EITHER SIDE OF THE CARRIER AND ON A 15% SLOPE. MAST JIB SHALL BE ABLE TO LIFT AND DROP INTO THE HOLES, STEEL RAILROAD RAILS UP TO 40 FEET IN LENGTH AND WEIGHING UP TO 2, 000 POUNDS. DRILL SHALL HAVE A MINIMUM 150 H. P. MOTOR AND AT LEAST A 300 CFM COMPRESSOR CAPABLE OF 16, 000 POUNDS OF PULL DOWN PRESSURE. PAYMENT WILL BE MADE ON THE PART OF THE RAIL THAT IS SATISFACTORILY PLACE BELOW GROUND LEVEL. NO PAYMENT WILL BE MADE FOR THE PART OF THE RAIL EXTENDING ABOVE THE HOLE. CONTRACTOR IS RESPONSIBLE FOR CUTTING ANY RAILROAD STEEL THAT IS NOT FLUSH WITH THE ESTIMATED FINISHED SHOULDER AFTER BEING DROPPED INTO DRILLED HOLES. CONTRACTOR MUST BE ABLE TO DRILL AND INSTALL 800 FT OF RAILROAD STEEL PER 8 HOUR WORKDAY. LEEWAY WILL BE GIVEN FOR WEATHER AND UNFORSEEN CIRCUMSTANCES AT THE DEPARTMENTS DISCRETION. THE TRANSPORTATION CABINET MAKE NECESSARY SITE PREPARATION AND FURNISH NECESSARY TRAFFIC CONTROL.

USA | NY | MONROE COUNTY | ROCHESTER Small City

City Of Rochester

Overhead Wire Installation

Separate street lights from utility electric 26 scope

Service contract to isolate and/or separate city- owned street lighting facilities from the RG& E distribution network Fuse and fuse kit installation, reconfiguration/installation/removal of street light wires or cables, coordination of RG& E isolation/separation work, attachment of light identification tags, underground enclosure installation, underground splices or repairs, excavation and restoration, conduit installation/replacement, cable furnish and install, overhead wire install/remove, consultation, troubleshooting, removal of utility identification from steel/metal box covers, clean out handhole/pullbox, handhole frame cover adjustment

Bid Close Date:

More bid opportunities are waiting for you!
Start your free 14-day trial to see all results and access the bid documents.

Search by what you sell

Illustrative example

Find bids beyond an exact phrase.

Choose an example to see how smart search can help.

You supply: Office chairs

How a solicitation might describe it

Supply of ergonomic seating for administrative work

The seating is described by its use, without repeating the product name.

Smart search helps connect what you supply with different descriptions. Try it with your own products during the free trial.

Start free trial

You supply: Pest control

How a solicitation might describe it

Insect and rodent management services

A different expression describes a related service.

Smart search helps connect what you supply with different descriptions. Try it with your own products during the free trial.

Start free trial

You supply: Toilet paper

How a solicitation might describe it

Supply of two-ply bathroom tissue

Another description of the product, including a purchasing specification.

Smart search helps connect what you supply with different descriptions. Try it with your own products during the free trial.

Start free trial

Fictional examples to explain how it works. This example does not run a search.

Tell us what you supply and see bids right away

  1. Start with your email

    Enter your email to start the free trial. There are no automatic charges.

  2. Tell us what your business supplies

    Add your specific products or services and the locations you want to search. Your first monitoring group is created for you.

  3. See matching bids right away

    Matching bids appear as soon as you save your products and locations. Explore groups and email settings at your own pace.

For teams and integrations

Send bid data into your CRM, BI or internal workflow via the Bid API, with JSON or XML output.
View API documentation
User testimonials
We selected the most helpful reviews from real users. Order may change periodically.
All bids related to our product are captured by you and sent to us. In my opinion, it’s perfect—broad coverage and easy searches across the bid documents.
R. M. Ferreira
Very good and accurate information about the tenders: consistent and precise.
G. R. Ortiz
The idea of ​​using a keyword and sending the information by email is very good.
U. Solutions
Excellent. More searches and many advantages.
R. Lopez
Excellent information. Just what I was looking for.
L. H. Borrelli
I consistently received notifications about bids within the specific segment I chose to monitor. The system simplifies processes that used to be complex, offering a navigation experience that is easy, fast, and modern.
G. P. da S. E. Guimaraes
Everything is perfect. They are a great help in finding bids relevant to our field of work. I really appreciate that the bids are sent directly to my email; it’s a huge help in identifying where I can contribute and what I can do.
Oto
The tool is truly effective at scanning bid documents, efficiently delivering bids.
G. D. Reis
It encompasses all portals in one place.
G. Ferrea
I am very satisfied; it's a very useful tool.
J. S. Garcia
The search engine that finds what I'm looking for just by entering keywords
J. P. L. Construccion
You see a lot of tenders; you get emails with the alerts.
M. Camarasa
Smart search helped discover bids I hadn't even imagined receiving notifications for.
M. F. Cortez

Why use BidHits for government bidding

Filter bids, save promising opportunities and ask questions about solicitation documents.

Frequently asked questions

It is a government bid search service for the United States. Find opportunities related to what your business supplies, keep separate searches organized and receive email alerts.

Start with your email. Then add specific products or services and the locations you want to search. Your first monitoring group is created automatically, so you can get started without setting everything up.

No credit card is required and there are no automatic charges. Try the service for 14 days and choose a paid plan only if you decide to continue.

As soon as you save what you supply and your preferred locations, you can see matching bids on the site. Start with that list and explore filters and other tools at your own pace.

Official portals remain the source for solicitation documents and requirements. BidHits combines smart search, state filters, groups and alerts to help you spend less time sorting through notices. Try it with your own products and compare it with your current bid research.

They are separate searches for different parts of your business. You could have one called Well-equipped workplaces and another called Growing in Texas, each with its own products, services and locations. You choose the names. The number of groups depends on your trial or plan.

Every plan includes email alerts. The Essential plan sends alerts directly to your main email. The Professional and Advanced plans let you group email addresses into lists, such as Sales and Purchasing, then choose which list receives alerts from each monitoring group. Groups define what to track; lists define who receives it. Several groups can use the same list. List and additional email limits apply to the whole plan, not separately to each group or list.

Alerts send matching bids to your registered email according to the schedule available in your trial or plan. You can adjust email settings. Results appear on the site after you save your products and locations; emails follow the sending schedule. Where several daily sending times are available, the schedule applies across all groups and lists.

Use specific product or service names, such as office chairs. Smart search helps connect your offer with other descriptions, such as pest control and insect and rodent management. AI can make mistakes: check whether each opportunity is relevant and adjust your search terms when needed.

Filter by location, procurement type, dates and values, view opportunities on the map and save relevant bids as favorites. Add private notes so you can pick up your review later.

Yes. The AI assistant answers questions about documents the system can read, within the question limit for your trial or plan. It supports your review; check the answers against the solicitation documents and the official source.

Look for the document or official notice link in the opportunity. If the source portal requires a login or restricts direct access, you may need to open the procurement page and download the documents there.

If you do not choose a paid plan, the bid list becomes limited. Nothing is charged automatically. You decide whether to subscribe and continue with the features of your chosen plan.

Human support is available for questions about access, searches, monitoring groups and settings. Start with the basics and explore other tools at your own pace.

Yes. The API is included in the Professional and Advanced plans, with one key per account and a separate API request allowance shared across its sessions. See the API documentation.

Plans start at $ 20.00/month, with options for different needs and subscription terms. Plans are prepaid: check the total amount and duration before confirming. Start with the free trial and assess the results before subscribing, with no automatic charges.

See how it works

Start free trial

Add what you sell, get scheduled alerts, open documents or the official page, and use filters by region and method.

Transcript
Welcome to BidHits. Finding public tenders and bids is important. But what really matters is quickly identifying the opportunities that match what your company sells. To get started, enter a few keywords that describe your products or services. BidHits shows relevant opportunities, highlights your keywords, and organizes everything by date. Smart search is already enabled and uses artificial intelligence to expand your results, even when the tender uses different words from the ones you searched for. For each opportunity, you can view a summary, access documents, mark it as a favorite, add private notes, remove what is not relevant, or view it on the map. You can also use filters, run searches, and explore the day's opportunities directly on the map. Start using BidHits now. It's fast, practical, and you can try it for free.
AI Assistant
Ask me about the bid...
Loading summary...