Solicitation extended to August 3, 2026, for Cable Assembly, Spec. Electronic submission of quotes required. Government source inspection is mandatory. All freight is FOB origin. Firm fixed price (FFP) award. Offerors must be authorized sources. Quotes must include unit price, total price, lead time, expiration date, and delivery vehicle. Evaluation based on best value, considering price, past performance, and supplier performance risk. Preproduction samples and production lot testing are required. Mercury-free material is essential for submarine and surface ship use. Security clearance is required.
Quotes shall be received no later than August 3, 2026. Quotes shall be received no later than the date specified in the solicitation in order to be considered.
Payment instructions are available via Wide Area Workflow (WAWF). wide area workflow payment instructions jan 2023
The government will issue an order resulting from this request for quotation to the responsible offeror whose quotation results in the best value to the government, considering both price and non-price factors. the government will issue an order resulting from this request for quotation to the responsible offeror whose quotation results in the best value to the government, considering both price and a non price factors.
To become a qualified manufacturer, the contractor must manufacture and test two units of specific cable assemblies (5w1, 5w2, 5w7, and 5w8) according to specification requirements. To become a qualified manufacturer of any of the cables listed above, the contractor must manufacture two 2 each of the 5w1, 5w2, 5w7, and 5w8 cable assemblies and test them iaw the requirements of specification **** ****, rev j.
A preproduction sample of two units of each specified cable assembly type is required to be manufactured and tested before starting production. a preproduction sample of two 2 each of the 5w1, 5w2, 5w7 and 5w8 cable assemblies shall be manufactured using the methods and procedures proposed for production.
Implementing engineering changes, waivers, deviations, or technical inquiries into the contract without approval of the contracting officer will be at the sole risk of the contractor. contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract purchase order without approval of the contracting officer will be at the sole risk of the contractor.