City Of Edmonds
Storm Drain Construction/ Cipp Lining
2026 Combined Cured In Place Pipe ( CIPP) Rehabilitation Project, City of Edmonds, WA # **** & ****
Construction of the City of Edmonds 2026 Combined Cured In Place Pipe ( CIPP) Rehabilitation Project Schedule A Phase 13 Sewer: Installation of approximately 258 linear feet ( LF) of 8- inch diameter cured- in- place ( CIPP) structural liner, along with both preconstruction and postconstruction closed- circuit television ( CCTV) pipe inspection. Schedule B Phase 6 Storm 88th Avenue West: Installation of approximately 690 linear LF of 8- inch diameter CIPP structural liner, along with both preconstruction and postconstruction CCTV pipe inspection. Schedule C Phase 6 Storm Daley Pl: Installation of approximately 15 LF of 8- inch diameter, 480 LF of 12- inch diameter, 520 LF of 15- inch diameter, and 150 LF of 18- inch diameter CIPP structural liner, along with both preconstruction and postconstruction CCTV pipe inspection. This site will also include 20 LF of 12- inch diameter PVC and general restoration.
Bid Close Date: