09/18/2025 - USA | CA | SANTA BARBARA COUNTY | GUADALUPE | 93434 Small City
Guadalupe City Hall - CA
Addendum No. 2 - 303 Obispo Site Improvements
303 obispo site improvements evbus charging facility project addendum no. 2 1 mobilization, 2 siltation fences, 3 concrete washout, 4 construction entrance, 5 check dams, 6 street sweeping and vacuuming, 7 storm drain inlet protection, 8 site clearing, 9 earth moving cumulative, 10 12 hma type a pg ****, 11 commercial driveway 20 wide, 12 sidewalk, 13 class 2 aggregate base, 14 concrete curbs, 15 pavement markings, 16 gate operators, 17 chain link fences and gates, 18 storm drainage utility pipe, 19 plastic drain grates, 20 ductile iron drain grates, 21 bioretention basin, 22 common electrical work, 23 low voltage electrical copper conductors, 24 electrical connectors, 25 electrical equipment labeling, 26 conductor insulation testing, 27 cu ground rod installation, 28 ufer ground installation, 29 ground resistance testing, 30 pvc schedule 40 conduit, 31 pvc schedule 80 conduit, 32 galvanized rigid steel conduit, 33 electrical metallic tubing, 34 flexible metal conduit, 35 liquid tight flexible metal conduit,
AI helper
Addendum no. 2 to the 303 Obispo Site Improvements EVBus Charging Facility Project. Changes to the bid schedule, technical specifications, and plans are detailed. References to hot mix asphalt (HMA) are changed to 12-inch type A HMA PG **** base thickness is changed to 12 inches for asphalt driveways. Bid item 44 (480V to 208V 150kVA step-down transformer) now includes the cost of the contractor-supplied equipment. Questions and answers regarding the addendum are included. The bid package is available online at www. ***. *. * contract requires compliance with state and federal prevailing wage rates, specific plans, and specifications. Bidders must acknowledge the addendum on page 4 of the bid documents. The award of the contract will be to the lowest responsible bidder whose proposal complies with all requirements.
The bid will be awarded to the lowest responsible bidder whose proposal complies with all requirements. Bids will be compared by the total mathematical bid as determined by the engineer. The total mathematical bid is the summation of all required bid items, excluding bid alternates. Bid items are calculated by multiplying the engineer's estimate quantities by the unit bid prices. In the case of a discrepancy between the total mathematical bid and the total bid written above, the total mathematical bid shall govern.