Dept Of Defense- Dept Of The Army- Usace- Nad- W2Sd Endist Baltimore
Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD - The project consists of maintenance dredging approximately 2, 250, 000 cubic yards ( cy) from the deep- draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027.
Maintenance dredging of Baltimore Harbor and Channels Maintenance dredging of approximately 2, 250, 000 cubic yards from deep- draft federal navigation channels serving the Port of Baltimore. Work to be performed between November 2026 through March 2027. Dredging depth is 50 feet mean lower low water with 1. 5 feet allowable over depth. Approximately 1, 538, 000 cy from Maryland approach channels ( Craighill Entrance, Craighill Angle, Cutoff Angle, Upper Range Channels) to be placed at Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700, 000 cy from Baltimore Harbor Channels ( Brewerton Angle, Curtis Bay Channels) to be placed at Cox Creek Dredged Material Containment Facility.
Bid Close Date: