City Of Oakdale - CA
Surface Restoration
Sewer Main Replacement Project
Sewer Main Replacement Project Replacing the existing 8inch concrete sewer main with a new 8inch SDR 26 sewer pipe along north 5th avenue between east a street and east b street. Remove and replace the existing 8inch concrete sewer main. Install approximately 316 linear feet of 8inch sdr 26 sewer pipes from the existing lamp hole at 540 north 5th avenue to the existing manhole located on east b street. Install approximately 158 linear feet of 8inch sdr 26 sewer pipe from the second cleanout on the north side of 540 north 5th avenue to the existing manhole located on east a street. Install approximately sixteen 16 sewer lateral connections. Extend each lateral to the back of sidewalk for each property served. Install a 4inch cleanout at the back of sidewalk and connect it to the respective sewer lateral. Remove two 2 existing sewer lamp holes. Replace removed lamp holes with two 2 new standard sewer manholes to improve access and longterm maintenance. Remove two 2 existing bricksupported manholes and replace t