Installation of government-owned air compressor and Hotsy steam cleaner at Joint Base McGuire-Dix-Lakehurst, NJ. RFQ for firm-fixed-price contract. Period of performance is 60 calendar days. Mandatory labor rates apply (Davis Bacon Act). Questions deadline: June 27, 2026. Proposal deadline: June 30, 2026. Mandatory site visits are scheduled for June 22 and June 25, 2026. Contractor must submit various reports and drawings post-award. Payment protection (bond, LOC, or CDs) is required within 10 days of award. Physical work prohibited before Notice to Proceed (NTP).
The period of performance is 60 calendar days, starting after the Notice to Proceed (NTP) is issued. period of performance60 calendar days
Within 10 days of award, the contractor must submit one of three alternative payment protections: a payment bond, an irrevocable letter of credit, or certificates of deposit. payment security submission within 10 days of award
Manufacturer compliant warranty documentation is a mandatory technical submittal. manufacturer compliant warranty documentation
To be deemed technically acceptable and responsive, the successful contractor must deliver the physical installations and technical deliverables detailed in the solicitation. he successful contractor must deliver the physical installations and technical deliverables detailed below
Prospective offerors are highly encouraged to inspect the site. A primary site visit is scheduled for Monday, June 22, 2026, and a secondary site visit for Thursday, June 25, 2026. prospective offerors are highly encouraged to inspect the site
Failure to inspect the site shall not constitute grounds for a claim after award. failure to inspect the site shall not constitute grounds for a claim after award