City Of Florissant - MO
James Eagan Civic Center Spa Replacement
Removal and Replacement of Spa and Filtration System Demo of the existing spa and tile surrounding will be completed by city of Florissant Demo of existing spa equipment Install new spa shell **** deep, fiberglass shell, replumbed in schedule 40 ridge pvc. Water line tile with depth markers on interior walls of spa. Hook to pipes sleeved through the floor Install all new equipment package, including filter pump, jet booster pump, filter pump, and heater. All new piping, valves and fittings Reuse existing chemical controller, chlorinator, and ph feeder New emergency shut off and timer system Build new deck around spa Using trex type material for the top Approval by county health department Sides of structure to be enclosed with material and have access panel to underneath of spa Start up and commissioning All electrical work to be completed by contractor The city of Florissant will keep old pumps and filter for emergency back up