Sealed bids for refurbishment of body and tube slides at Seascape Family Aquatic Center due by 10:00 AM on 02/12/2019. Work includes surface preparation, coating, repairs, and caulking. Bid guarantee of 5% required. Performance and payment bonds at 100% of contract price. Prevailing wages apply. Substantial completion by May 17, 2019. Award to lowest responsible bidder. Contact Dustin Hugen at ****.
Substantial completion is required by May 17, 2019. The work must commence by April 1, 2019, weather dependent, and continue with due diligence until full completion and acceptance. As stated: substantial completion date: may 17, 2019.
Monthly estimates may be presented no later than the first Monday of each month, with payments made within approximately 30 days after review by the owner. Final payment is made within approximately 30 days of final inspection and approval. As stated: payments will be made within approximately thirty 30 days after review by the owner.
The contractor and/or manufacturer must provide a minimum one-year warranty for all materials and workmanship. As stated: the contractor andor manufacturer shall provide a minimum of one 1 year warranty for all materials and workmanship associated with the project.
The contract will be awarded to the lowest responsible bidder whose bid conforms to the invitation. As stated: award of contract will be made to the lowest responsible bidder, as determined by the board of commissioners.
Bidders must examine all documents, visit the site, and verify conditions. Submission of a bid is presumptive evidence of site visit and familiarity with local conditions. As stated: submission of bid will be considered presumptive evidence that the bidder has visited the site.
Failure to provide required bonds within 5 days after notice of award constitutes default, and the owner may award to the next bidder or readvertise. The defaulting bidder may be charged the difference in bid amounts. As stated: a charge against the defaulting bidder may be made for the difference between the amount of the bid.
Bidders should visit the site to ascertain the nature and location of the work and local conditions. Failure to do so will not relieve bidders from responsibility for estimating properly. As stated: bidders should visit the site and take such other steps as may be reasonably necessary.
Bids submitted after the closing time will be returned unopened. Failure to furnish a bid guarantee in proper form and amount may cause rejection. Failure to list surety company on bid proposal is a nonresponsive bid. As stated: bids submitted after the closing time will be returned unopened.