Tjc - Tyler Junior College - TX
Augered Cast In Place Piles/ Construction Testing
CSP # 26- 10 Ornelas Streambank Stabilization **** Geotechnical Report
Geotechnical investigation for a new dormitory at Tyler Junior College, Tyler, Texas.
AI email alerts, regional filters, and access to bid documents
Augered Cast In Place Piles/ Construction Testing
CSP # 26- 10 Ornelas Streambank Stabilization **** Geotechnical Report
Geotechnical investigation for a new dormitory at Tyler Junior College, Tyler, Texas.
2026 Camelot Large Onsite Septic System ( LOSS) Project
Camelot large onsite septic system loss Bid item 1: minor changes Bid item 2: mobilization Bid item 3: clearing and grubbing Bid item 4: removing wire fences Bid item 5: roadway excavation new access road and pile relocation Bid item 17: loss drainfield excavation and backfield Bid item 6: testing pipe delivery piping Bid item 7: 8 inch pvc **** sanitary sewer pipe Bid item 8: 10 inch pvc **** temporary bypass system Bid item 9: structure excavation class a Bid item 10: shoring or extra excavation class a Bid item 11: gravel backfill for walls Bid item 12: concrete class **** Bid item 13: steel reinforcing bar Bid item 14: crushed surfacing base course Bid item 15: erosion and sediment control Bid item 16: seeding, fertilizing and mulching Bid item 18: loss drainfield piping complete Bid item 19: loss pumps, delivery system Bid item 20: loss controls system Bid item 21: loss electrical installation Bid item 22: fence and gate type 2 Bid item 23: chain link fence and gate type 3 Bid item 24: abandon existing d
Bid Close Date:
Foundation Testing/ Pile Testing/ Geotechnical Testing
W205 Bid- Directional Load Test - Sound Transit W205 Bid- Directional Load Test CN ****- 25 Closing Date: 03/13/2026 02: 00: 00 PM PT Detail: The scope of work consists of a Bi- Directional Load Test to evaluate the constructability and performance of a permanent foundation system for a cable- stayed bridge supporting the aerial guideway over the Duwamish River. The test will verify design assumptions and enhance confidence in design parameters to optimize the final foundation design. Data from this test
Bid Close Date:
Subcontractors and Suppliers for Fenton Parkway Bridge Project ( Contract ****) PLEASE SUBMIT QUOTES BY EMAIL TO ***@***. *. * OR FAX TO ( 858) 271- **** request access to the bid documents, please send an email request to ***@***. *. * and include the following information: Company Name, Contact Person( s), Email Address, Phone Number, Scope of Work. Access to the documents will be issued via Building Connected ( registration required, at no cost)www. ***. *. *
project title subcontractors and suppliers for fenton parkway bridge project asphalt paving, cidh pile, clear and grub, cold plane ac, concrete barrier, electrical, fencingrailingguardrail, furnish and erect precast girder, grind and groove bridge deck, hydroseeding, joint seal, landscape and irrigation, minor concrete, painting and coating, reinforcing steel, roadside signs, rock slop protection, stain concrete, striping, underground, aggregate supply, bridge bearing pad supply, formliner supply, geotextile supply, joint seal assembly supply, misc. iron and steel supply, misc. metals supply, pipe supply, precast drainage inlets, qc testing, ready mix concrete supply, settlement monitoring, street sweeping, traffic control materials, water truck
Bid Close Date:
Materials Testing
**** - Construction Management Services for Westside Road Bridge over Canyon Hollow Creek Replacement Project
Request for Proposal for Construction Management Services for Westside Road Bridge Over Canyon Hollow Creek Replacement Project The project includes quantities are approximate, replacing the existing bridge with an 84feetlong, 3span, castinplace reinforced concrete slab bridge with an ultimate width of 41feet. The bridge work includes removal of the existing bridge, 1, 450feet of 30inch castindrillhole cidh concrete piles, 444 cubic yardscy of structural concrete, 122, 000 lbs of bar reinforcing steel, 331 cy of structure excavation, 140 cy of structure backfill, 124feet of concrete barrier type 732sw, 114feet of concrete barrier type 836, tubular handrailing and tubular bicycle railing, 20inch ductile iron pipe, reu electrical conduits, 2 pge gas, and 138 cy of rock slope protection. The road work includes 700 cy of roadway excavation, 900 tons of asphalt concrete, 500 cy of aggregate base, 100 cy of minor concrete, 62feet of midwest guardrail, 230feet of 20inch dip, removal of existing asbestos cement pipe,
Bid Close Date:
Expands your search so you don't miss relevant opportunities.
Get opportunities by email; open bid documents or the official posting; view them on the map.
Filter by region, method, and value; favorite items and add notes to organize opportunities.
Add words related to your products or services. Our AI broadens the search so you don't miss opportunities.
Start the 14-day free trial and receive alerts with links to bid documents or the official posting.
Add or edit keywords, set regions, choose your email delivery schedule and email style. Map view available in the dashboard.
I closed deals thanks to the information gathered by the search tool. There’s no need to research across multiple media outlets.
The platform is very user-friendly.
The idea of ​​using a keyword and sending the information by email is very good.
The information helps me submit my bids on time for bids, and I also have readily available information on upcoming bids. So far, I am very satisfied with what I have received.
Well-focused searches and highly professional service. It’s been very useful, and hiring you was the right decision. With agility and confidence in our market segment, it’s driving our revenue growth.
It helps me identify areas of opportunity and find bids related to my work area.
Not only is the service excellent, but the support when I have questions is great too—the site has really impressed me.
It's an extremely useful tool.
I’ve used another platform before, and after discovering this one, I can see it’s much better. I find my bid opportunities faster, which speeds up my work.
Excellent platform to help promote and expand the reach of your work.
I’m absolutely delighted with the system’s performance so far. This software has exceeded all my expectations, ensuring that no crucial keyword, such as “cathodic protection” and others related, goes unnoticed. Its precision and efficiency are remarkable, providing extra peace of mind in our operations. I’m truly impressed by its effectiveness.
Efficiency in search times.
Explore a term, enable AI email alerts, access bid documents or the official posting, and filter by region and method.