The contractor is responsible for drilling and installing a wildlife water well with a solar power panel system at Medicine Lake NWR, MT. The project must comply with all applicable federal, state, and local laws, regulations, and codes. The contractor is responsible for safety, environmental protection (pollution control, water pollution prevention, solid waste, hazardous waste, noise pollution), temporary facilities and controls, site access, equipment storage, protection and restoration, traffic regulation, delivery and storage, means and methods, final inspection, final cleanup, and contractor qualifications. The project must be completed by December 31, 2025. All questions should be emailed to ***@***. *. * site representative is Derek Soukup (***@***. *. *). Additional information about the project is available on the website.
The project must be completed by December 31, 2025. Additional time may be allowed to obtain permits and lead times for materials.
A minimum 2-year warranty is required on all components and installation of the solar units.
The contractor and all subcontractors must have all necessary federal, state, and local licenses and/or certifications to perform the work.
Failure to comply with environmental regulations may result in work stoppage, and environmental litigation time lost due to work stoppage may not be the subject of a claim for extension of time or for costs or damages. Destruction of historic and prehistoric sites and/or unauthorized collection of cultural materials can result in criminal and/or civil penalties, including fines, prison sentences, and/or confiscation of equipment.
Please contact ***@***. *. * to request a site visit.