City Of Encinitas / San Dieguito Water
Air Release and Blow Off Replacement Project Phase II ( CW25D) The work to be done generally includes removal and replacement of existing valves and appurtenances with new contractor provided valves and appurtenances at the sites listed below: a) Site No. 1 - Hot tap existing 30" steel main and installation of new ( 1) 6" blowoff assembly, including valves, fittings, appurtenances, couplings and thrust blocks. b) Site No. 2 - Replacement of ( 1) 6â gate valve inside vault with new a valve including fittings
air release and blow off replacement project phase ii cw25d a site no. 1 hot tap existing 30 steel main and installation of new 1 6 blowoff assembly, including valves, fittings, appurtenances, couplings and thrust blocks. b site no. 2 replacement of 1 6â gate valve inside vault with new a valve including fittings, appurtenances, and couplings. c site no. 3 replacement of 1 6â plug valve inside vault with new gate valve including fittings, appurtenances, and couplings. d site no. 4 hot tap existing 30 steel main and installation of new 1 6â blowoff assembly including valves, fittings, appurtenances, couplings, and thrust blocks. e site no. 5 replacement of manual arv with 1 4â avar assembly with new valves including fittings, appurtenances, couplings, and thrust blocks. f site no. 6 installation of 1 6â blowoff assembly inside vault including, valves fittings, appurtenances, couplings, and thrust blocks. g site no. 7 replacement of 1 6â blowoff assembly including, valves fittings, appurtenances, couplings, and
Bid Close Date: