Capital Construction Request - MD
Hdpe Sewer Pipe
**** & **** Crownsville Memorial Park SPS & FM & WTP Decommissioning - The Work includes the following major items: A new Crownsville SPS **** which includes: Demolition of an existing SPS and the construction of a new 555 GPM wet- pit submersible SPS including, but not limited to precast structures; sewage pumps, piping and valves; flowmeter; sewage grinder; odor control system; precast concrete control building; ventilation equipment; electrical switchgear, transformers & service and distribution
Decommissioning of Crownsville Memorial Park SPS, FM, and WTP Lot 1: New Crownsville SPS ( ****) - Demolition of existing SPS, construction of a new 555 gpm wet- pit submersible SPS including precast structures, sewage pumps, piping, valves, flowmeter, sewage grinder, odor control system, precast concrete control building, ventilation equipment, electrical switchgear, transformers, service and distribution equipment, lighting, instrumentation, control equipment, VFDs, emergency generator, and transfer switches. Lot 2: New Crownsville FM ( ****) - Construction of approximately 20, 350 linear feet of 8- inch DR 11 HDPE sewer FM and associated items. Alternate Bid Item: Decommissioning of the existing WTP.
Bid Close Date:
Lot 1: **** and ****- SPS Base Bid Items A1- A3, FM Base Bid Items B1- B4, Contingency Items C1- C16, Add Alt Items ALT 1- ALT 4