Milwaukee Metropolitan Sewerage District
Coating
Secondary Clarifier 19 Sealant Repair at South Shore Water Reclamation Facility- The sealant on the grout covering the floor of Secondary Clarifier 19 at SSWRF has failed and is peeling. The clarifier has a circular floor diameter of 112 feet. The Owner seeks to secure a contractor to undertake the following work for Secondary Clarifier 19: Removal of all sealant from the clarifier floor Surface preparation of the clarifier floor Application of new sealant to the clarifier floor
Bid Close Date: