Dnr - Michigan Department Of Natural Resources - Mi - Traverse City Office
Cinder Hill Aspen
4. 5 dbh within a specified area of the sale are damaged, liquidated damages will be assessed for all trees damaged. rates will be in accordance with general condition and requirement 3. 4 damaged timber. 4 transportation 4. 1 construction 4. 1. 6 road construction 424 construction of new roads or improvements of existing roads shall be done in such a way as to minimize the environmental and visual impacts. merchantable trees shall be cut and utilized unless otherwise directed. nonmerchantable trees shall be page 4 of 7 severed and laid flat on the ground. slash shall be scattered, not left in windrows, and kept a minimum of 10 feet back from the road edge. stumps shall be set upright, not left on edge, and be moved at least 10 feet away from the road edge. disturbed soil shall be feathered into the woods and not left in berms or windrows. 4. 1. 7 road closure **** all new roads built into the sale must be blocked to vehicle traffic within 30 days of completion of hauling. overgrown roads that are reopened sh
Bid Close Date: