Town Of Wells-ME
Wells Harbor Pier Expansion
Wells Harbor Pier Expansion 1. General Items 1. 1 Mobilization Demobilization 1. 2 Maintenance of Pier Access 1. 3 Erosion Control 1. 4 Site Trailer and Signage 2. Paving 2. 1 Full Depth Paving 2. 2 Paver Area 3. Reinforced Concrete 3. 1 South Concrete Abutment 3. 2 North Concrete Abutment 4. Timber Pier Reconstruction and Expansion 4. 1 South Pier Framing 4. 2 South Pier Vertical Piles 4. 3 North Pier Framing 4. 4 North Pier Vertical Piles 4. 5 Remove and Reinstall Existing Fender Piles 5. Piersite Amenities 5. 1 New Pier Handrail 5. 2 Demolish Existing Pier Handrail 5. 3 Relocate Existing Sea Water Pump 5. 4 Reroute Existing Conduit and Reconnect 120V Electrical 5. 5 Remove and Replace Existing Flagpole 6. South Float System 6. 1 Aluminum Gangway 80 ft 6. 2 6. 5 x 16 Floats 6. 3 16 x 18 Float 6. 4 6. 5 x 24 Floats 6. 5 Timber Guide Piles South Float System 6. 6 Relocate Existing Guide Pile 6. 7 Remove and Dispose of Piles 7. East Float System 7. 1 Installation of Timber Guide Piles East Float System