Dept Of Defense- Dept Of The Army- Usace- Mvd- W07V Endist Vicksburg
Supply and Install a Metal Storage Building at Bolivar Mitigation Area - W912EE *** Amendment **** has been issued. This amendment changes the period of performance to 120 days, it removes the mamufacturer tool kit requirement, and it extends the proposal due date to Friday, June 05, 2026 at 2: 00 PM CST
Supply and install a metal storage building Supply and install one 60ft x 60ft I- beam red iron steel building with a 14ft eave height and a 6- inch concrete welded wire reinforced floor. The building will have a 26- gauge galvalume roof and walls with a 4: 12 roof pitch, 6 inches of eave overhang, and 6 inches of gable overhang. Walls and trim will be tan colored. Columns will be supported by concrete footings. Concrete footings and slab will be a 3, 500psi mix with engineer- designed rebar reinforcement. One 12ft H x 16ft W rollup steel door ( 22- gauge steel, manual chain hoist) will be installed on each endwall. One 30 x 70 steel walk- in door with hardware will be installed on one sidewall. Building will be rated for 140 mph wind and 20 psf snow load. Stamped and sealed drawings and calculations by a licensed professional engineer will be provided.
Bid Close Date: