City Of Novi
Roundabout Construction
Crescent Boulevard and Lee BeGole Drive Extension This project consists of approximately **** feet of 12& rdquo; ductile iron and 16& rdquo; HDPE water main, **** feet of concrete storm sewer, **** feet of curbed asphalt roadway with sidewalk, 2 box culverts, and an 11 Mile roundabout.
Construction of Crescent Boulevard and Lee Begole Drive Extension Base Bid: - Water main installation ( **** feet of 12 ductile iron and 16 HDPE) - Storm sewer installation ( **** feet of concrete) - Roadway construction ( **** feet of curbed asphalt with sidewalk) - Box culverts ( 2) - Roundabout construction ( 1) - Earthwork, aggregate base, drainage structures, pavement markings, traffic control, erosion control, turf establishment. Bid Alternate 1: Bishop Creek Stream Mitigation - Stream restoration and planting. Bid Alternate 2: Traffic Signal and Utility Improvements - Conduit installation, traffic signal equipment, street lighting, and related utilities.
Bid Close Date: